Laserfiche WebLink
DeLEUW <br />CATHER <br /> <br />Msrs. Warnick/Kawar <br />June 28, 1984 <br />Page two <br /> <br />Driveway and entrance to the County Fairgrounds, <br />Gate 2. It was originally proposed that the existing <br />entrance to the County Fairgrounds would remain in <br />its present location, approximately opposite Station <br />69+50. However, this location became the subject of <br />extensive discussions and reviews by City and County, <br />and two or three other locations were developed. <br />The final decision was to construct an entirely new <br />entrance located opposite Sta. 65+39. This required <br />revising plans which were substantially complete, <br />involving drainage, median layout, signing and strip- <br />ing, landscaping, and irrigation. It also required <br />the length of our project to be extended approximately <br />300 feet to the west, to provide a left-turn pocket <br />for the new entrance, all for the Bernal Ave. Underpass. <br /> <br />Changes involving transfer of railroad ownership from <br />Western Pacific to Union Pacific. Our original bridge <br />designs were based on preliminary drawings approved <br />by the Western Pacific's Bridge Engineer in 1982. <br />Although we were able to avoid complete redesign, <br />considerable effort was involved in substantiating <br />the validity of our designs, providing legal back- <br />ground and demonstrating to Union Pacific that it <br />would be responsible for costs of any design changes <br />or increases in cost of construction. <br /> <br />Nevertheless, on the very day that bids were opened <br />by the City, we received a marked set of prints of the <br />bridge structural drawings from the UPRR's Chief <br />Engineer Office, Omaha, requesting changes to the deck <br />dimension~ ballast trough~ precast boxes, and details <br />of the three underpass structures. Mr. Warnick verbally <br />authorized us to make the requested changes, which <br />are described in a separate letter to the City. <br /> <br />Changes to temporary track locations near Sunol and <br />Radum, shown on Sheets R1 and R2 of the Plans. With <br />the new management at Union Pacific, the previously <br />designed temporary track locations, as depicted on <br />Drawings R1 and R2, and which were taken from the WPRR- <br />SPTCO. Joint Trackage Agreement, were redesigned by <br />Union Pacific. It was necessary for us to revise the <br />Plans and Special Provisions to reflect these changes <br />in Addendum No. 1. <br /> <br /> <br />