My WebLink
|
Help
|
About
|
Sign Out
RES 84342
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 2:37:40 PM
Creation date
1/26/2000 9:34:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/10/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DeLEUW <br />CATHER <br /> <br />Msrs. Warnick/Kawar <br />June 28, 1984 <br />Page three <br /> <br />Alignment changes to Harrison and Augustine Avenues. <br />As a result of negotiations between the City of Pleas- <br />anton and the City of San Francisco's Water Department, <br />we were instructed to revise our substantially pre- <br />viously completed designs involving Harrison and <br />Augustine Avenues. Construction was extended to <br />include portions of existing Bernal Avenue, which was <br />not previously included in the projectscope. <br /> <br />Drainage and Utility provisions at South Verona Road <br />Underpass (County area). The scope of our services <br />specifically excluded any civil engineering, grading, <br />paving, or rela~ed work at the above site; our responsi- <br />bility covered design of the bridge structure only. <br /> <br />However, we were requested by the County Road Depart- <br />ment to assist in arranging for the relocation of <br />overhead PG&E lines, and for grading associated with <br />removal of the existing bridge structure and its <br />backfill. <br /> <br />Provisions for undergrounding existing utilities. <br />After review of our roadway plans for Bernal Avenue <br />and Del Valle Parkway, PG&E and Pacific Bell requested <br />that provisions be made to relocate and expand their <br />facilities in underground locations at Del Valle <br />Parkway and Bernal Avenue. This work was added to the <br />plans and the specifications, and required close <br />coordination with both utility companies. <br /> <br />Changes and revisions at Del Valle Parkway Underpass. <br />After plans had been substantially completed, we <br />received a request to provide a left-turn pocket, <br />driveway entrance, and driveway for the Amador Valley <br />Joint Union High School District opposite Station 89. <br />This required revisions to previously completed <br />grading and paving plans, pavement elevations, median <br />details (including provision for left-turn pocket <br />opposite Station 89), and landscaping and irrigation <br />plans, as well as the takeoff of quantities. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.