Laserfiche WebLink
ATTACHMENT B <br /> <br />"LEAK DETECTION AND REPAIR PLAN" <br /> ( Including Schedule) <br /> <br />As required by Section ~ Task I Item 10 of this Contract, a "Leak Detection <br />and Repair Plan" shall be submitted by the Grantee with the "Water Audit <br />Report" to the State Program Manager. <br /> <br />Utilizing the results of the water audit, identify on a map areas in <br />the distribution system with potential for leak detection. Quantify <br />the recoverable leakage in each area. Set priorities for which areas <br />are to be surveyed for leaks. <br /> <br />Present an itemized project budget identifying all costs including <br />both those Eligible and Ineligible Project Costs (as defined in <br />ARTICLE A-l, Definitions). <br /> <br />Identify the types of listening points to be used in the Leak Detec- <br />tion Surveys (i.e. water meters, valves, hydrants, etc.). Indicate <br />any locations where not all listening points would be used and explain <br />how a complete and effective survey would be accomplished. <br /> <br />Describe the method of detecting leaks and the method of determining <br />(pinpointing) the exact location of detected leaks. Consider the <br />limits of the equipment to be used. <br /> <br />e. Identify the type of leak detection equipment to be used. <br /> <br />Describe the type and makeup of crew ~Grantee, consultant or <br />combination) to be used. State the hourly wages of the crew including <br />eligible benefits· <br /> <br />g. State a schedule for conducting the surveys and repairing the leaks. <br /> <br />27 Contract B-550IC <br /> <br /> <br />