My WebLink
|
Help
|
About
|
Sign Out
RES 84306
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 1:08:28 PM
Creation date
1/25/2000 9:08:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Robert L. Warnick <br />City of Pleasanton <br /> <br />May 24, 1984 <br />Page 2 <br /> <br />Bernal and Del Valle (hours are for each structure) <br /> <br />Pier footings 8 hours <br />Piers 8 hours <br />Pier cap 4 hours <br />Abutments 24 hours <br />Wingwalls 32 hours <br />Sidewalk forms and rebar 16 hours <br /> <br />TOTAL HOURS: 92 <br /> <br />We recommend a 25% contingency for consultation on unexpected problems <br />and repeat inspections. Total project hours: (140 + 92 + 92) x 1.25 = <br />405 hours. <br /> <br />Piers and abutments would be ins!~ected: (1) after placing the footing <br />steel prior to pouring concrete; (2) after pier steel is in place prior <br />to closing forms: (3) after' abbtment steel is in place; and (4) after <br />abutment forms are in c~iace prior to !:,our. <br /> <br />Your inspection staff could control the pouring of footing and pier <br />concrete. The same procedure would be followed for wingwall con- <br />struction. <br /> <br />For South Verona, we would inspect the girder/deck construction at: <br />(1) placement of falsework, 4 hours; (2) formwork, 16 hours; (3) Rebar, <br />16 hours; (4) Post tension tube placement, 16 hours; (5) concrete <br />pours, 16 hours; and (6) pulling tendons, 8 hours. <br /> <br />On all structures we would inspect sidewalk forms and steel but the <br />placing and finishing of concrete would be done by your inspection staff. <br /> <br />We propose to perform these services at our standard charge rates (copy <br />attached) with an .~pprcxima~e 50-50 t~me SPlit between Construction <br />Manager and Resident Engineer. <br /> <br />205 hours Construction Manager (_a 63.00 = <br />200 hours i~esident Enginaer !~- ~I.99 = <br /> <br />$12,915 <br />lO,SO0 <br /> <br />TC"F':'!_ ~ Trave! = $23~715 <br /> <br />These rates are incre'ise,-! on ~:~n ann!~,al basis effective July 1, estimated <br />this July i? + 5%. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.