My WebLink
|
Help
|
About
|
Sign Out
RES 84306
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 1:08:28 PM
Creation date
1/25/2000 9:08:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"' NI GEORGE S NO[ [Ei/'~ND A. SSO,,:I,t~TES <br />~\ <br /> \ . <br /> <br />May 24, ]-984 <br />3020-84-90 <br /> <br />SAN JOSE <br /> <br />Mr. Robert L. Warnick <br />Director of Public Works <br />City of Pleasanton <br />City Hall <br />P. O. Drawer 520 <br />Pleasanton, CA 94566 <br /> <br />Re: <br /> <br />Limited Inspection/Consultation of Structural Portions of <br />Railroad Grade Separations with the Western Pacific Railroad Co. <br />Project No. 84-7 <br /> <br />Dear Mr. Warnick: <br /> <br />As you have requested, we are submitting the following proposal for <br />limited construction inspectiota/consultation services on the structural <br />portion of the subject project. <br /> <br />It is our understanding that you are to provide full-time inspection for <br />the day to day construction of ti~e three structures involved and that <br />our service would be to provide inspections/consultations at critical <br />periods to insure structural integrity of the structures. Our inspec- <br />tions would exclude piling (normally handled by your soils engineer) <br />and superstructure amurtenances such as railing and finishing unless <br />requested as extra work. <br /> <br />Our inspections would be limited to footings, piers, abutments, wing- <br />walls, girders (cast in place) decks and tendons. <br /> <br />We propose to conduct these inspections as follows: <br /> <br />South Verona Structure <br /> <br />Pier footings <br />Piers <br />Abutments <br />Wingwalls <br />Fal sework <br />Superstruct!.~re forlqs <br />Superstructl!re rebar <br />Superstructure post tension tubes <br />Superstructure conc:-et? pour <br />Sidewalk forms and rebar <br />Post tensioning tendo:;s <br /> <br />16 hours <br /> 8 hours <br /> 8 hours <br />16 hours <br /> ~ hours <br /> 16 hours <br /> 16 hours <br /> 16 hours <br /> 16 hours <br /> 16 hours <br /> 8 hours <br /> <br />TGT/,,L ~ <br /> <br />140 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.