My WebLink
|
Help
|
About
|
Sign Out
10 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
020309
>
10 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2009 11:23:47 AM
Creation date
1/28/2009 11:23:38 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/3/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
10 ATTACHMENTS
Document Relationships
04
(Cross Reference)
Path:
\CITY CLERK\AGENDA PACKETS\2009\022409
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Provide exclusion fencing for the western pond turtle, per MM BIO-4.2. <br />DEIR, p. 3.3-20 <br />4. Impacts on nesting birds or their habitat <br />Finding. The City finds that the following mitigation measure is feasible and has been <br />incorporated into the MMRP, thereby mitigating the impact to a less-than- <br />significant level: <br />Preconstruction nesting bird surveys shall be conducted by a qualified <br />biologist. If active nests are found within the construction footprint, delay <br />construction activities within a specified distance from the nest, as <br />determined by the biologist, per MM BIO-5.1. <br />DEIR, p. 3.3-21 <br />5. Impact on riparian vegetation in the Arroyo Mocho <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the MMRP, thereby mitigating the impact to a less- <br />than-significant level: <br />• Obtain a Streambed Alteration Agreement from the CDFG prior to any <br />construction activities that may result in any disturbance to stream <br />corridors, per MM BIO-6.1. <br />• Erect exclusion fencing around the spearscale mitigation area on the <br />north bank of the Arroyo Mocho, per MM BIO-6.2. <br />• Replace the vegetation within the Arroyo Mocho that is removed during <br />construction in accordance with a revegetation plan to be prepared, per <br />MM BIO-6.3. <br />DEIR, p. 3.3-22 <br />6. Impact waters of the State and the U.S. <br />Finding. The City finds that the following mitigation measure is feasible and has been <br />incorporated into the MMRP, thereby mitigating the impact to a less-than- <br />significant level: <br />Compensate for impacts to jurisdictional waters to ensure no net loss of <br />habitat function and values, per MM BIO-7.1. <br />DEIR, p. 3.3-24 <br />7. Interference with the movement of native or migratory terrestrial wildlife <br />Finding. The City finds that the following mitigation measures are feasible and have <br />been incorporated into the MMRP, thereby mitigating the impact to a less- <br />than-significant level: <br />• Minimize light spillover with devices that will direct lighting away from the <br />Arroyo Mocho, per MM BIO-8.1. <br />Stoneridge Drive Specific Plan Amendment and Staples Ranch Project <br />Environmental Impact Report Findings and Statement of Overriding Considerations Page 16 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.