Laserfiche WebLink
Hitigation measures m?-y i~.cl-..~.;-~r':, Dut are not <br />necessari[l, limited ~_o, the <br /> <br />i. C<}os tr~ction s'f Stcr. eridl.a Drive/I-680 <br /> <br />.Li.. !'~id,.t~:itl~ t,]: [k;pyard Roai/ll--580 bridge. <br />1. i.i.. '['~/ai]=i[.}{.}E'o!'~ion System Nanlament Programs, <br /> i.l~c-rl.~{~l[.~g, but not limittd to, ridesharing, <br /> utaggered ~.iork hours, flextime and van <br /> pooling. <br /> <br />Feasible kraffic mitigation measures shall begin <br />to be implemented on a priority basis, to be <br />determined by the City Engineer (and appealable <br />ko ~ihe City Council), beginning with the least <br />stringent and the least costly. Increasingly <br />more strtnge~t mitigation measures will be <br />requ.[red and implemented by Developer in order <br />to maintain traffic levels at better than <br />LOS E (91% of capacity). <br /> <br />Each site specific project submitted to the City <br />for final design approval shall be accompanied <br />by a traffic study satifactory to the City <br />Engineer ~rojecting future levels of service at <br />the above--.[is[ed affected intersections. Future <br />traffic co~dikions shall include existing traffic, <br />projected ~.raffic from other projects under con- <br />struction .'~d/or having received final City <br />approval:s, and projected traffic from the project <br />submitted '[:or approval. The street network <br />assumed shall. be that existing at the time the <br />project is submitted for approval and as it will <br />exist as a result of roadway improvements either <br />under construction or, if requiring only City <br />appro'val, having received final City approvals. <br /> <br />l'f ~he traffic study and analysis shows <br />tha~t any affected intersection, or inter- <br />sections, would exceed LOS D (equal to or <br />g~;~'~ate~' t}.Nu~ 91% of capacity) but can be <br />~nitigated so as to be no greater than <br />mid--[:OS D (86% of capacity), after miti- <br />gations, the City shall condition approval <br />upon implementation of those mitigation <br />measures~ No building permit may be <br />issued until the mitigation measures are <br />either under construction o.r the imple- <br />men~atien programs are established. <br /> <br /> <br />