My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
012009
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2009 1:20:56 PM
Creation date
1/13/2009 4:27:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/20/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sprinklers shall be required. Plans and specifications for the automatic fire <br />sprinkler system shall be submitted to the Pleasanton Building and Safety Division <br />for review and approval prior to installation. The fire alarm system, including water <br />flow and valve tamper, shall have plans and specifications submitted to Fire <br />Prevention for review and approval prior to installation. All required inspections <br />and witnessing of tests shall be completed prior to final inspection and occupancy <br />of the building. <br />55. The project developer shall keep the site free of fire hazards from the start of <br />lumber construction until the final inspection. <br />56. Prior to any construction framing, the project developer shall provide adequate <br />fire protection facilities, including, but not limited to a water supply and water flow <br />in conformance to the City's Fire Department Standards, able to suppress a major <br />fire. <br />ENGINEERING DIVISION <br />57. The applicant shall pay apro-rata share of the cost of undergrounding the existing <br />overhead utilities across the frontage on the development as determined by the <br />City Engineer unless otherwise approved by the City Engineer. Said payment <br />shall be due prior to the submittal of the parcel map to the City Engineer for <br />approval. <br />The existing overhead utilities servicing the existing homes and any new house <br />shall be undergrounded from the nearest utility pole (as designated by the Utility <br />Company). <br />Parcel Map Requirements: <br />58. A parcel map shall be required to subdivide the property into 3 lots. With the <br />parcel map, the project developer shall set forth the maintenance areas of the <br />proposed development and maintenance responsibilities. The project developer <br />shall record CC&R's at the time of recordation of the final map which shall create <br />a maintenance association for the development. The CC&R's shall be subject to <br />the review and approval of the City Attorney prior to recordation of the final map. <br />The maintenance association shall be responsible for the maintenance of all <br />private utilities, the common access driveway, and other common areas and <br />facilities on the site. The City shall be granted the rights and remedies of the <br />association, but not the obligation, to enforce the maintenance responsibilities of <br />the property owners association. <br />59. Prior to approval of the final map, the applicants shall create a joint <br />maintenance agreement for the private access drive. The agreement shall be <br />subject to review and approval by the City Attorney prior to recordation of the final <br />map. The drive shall be maintained to the satisfaction of the City Engineer. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.