which shall include the approximately one thousand nine hundred (1900) lineal feet of <br />eighteen (18) foot wide paved roadway with shoulders, Versa-Lok masonry walls that aze <br />necessary for roadway construction (and not Threehand's residential building pads), joint <br />trench utilities (including dry utilities, such as electrical, telephone, gas, cable), storm <br />drainage improvements, and water and sewer utility lines, as described more particulazly <br />in Section 4 ofthe Ftrst Amendment to the Purchase and Sales Agreement between the <br />City and Threehand (collectively the "Improvements"). <br />2. Time for Comoletion. After the City provides Tlu•eehand notice that the <br />rough grading for the access road has been completed and water tank construction is <br />substantially complete, Threehand shall have thirty (30) days to mobilize for <br />commencement of construction and then shall complete the Improvements within one <br />hundred and sixty (160) working days of mobilization; and Threehand acknowledges that <br />no work, delivery of materials, or activities may occur at the construction site on <br />weekends or federal holidays. <br />A. Extensions. The completion date shall be extended, for a reasonable <br />amount of time, due to events, such as weather, acts of God, strikes, material shortages, <br />labor disputes, lockouts, riots, acts of waz, epidemics, governmental regulations, fire, <br />earthquakes or other event, beyond the control of Threehand as may be determined in the <br />reasonable judgment ofthe City Engineer. The "Completion Date" shall be the 160 <br />working days, as provided above, plus any approved extensions. <br />B. Actual Damaees. If Threehand fails to complete the Improvements by <br />the Completion Date, Threehand shall pay to the City all actual costs incurred by the City <br />for a temporary waterline pipe and temporary overhead electrical service line for the <br />water tank after the expiration of the Completion Date. The City may deduct such actual <br />costs owed to the City from any reimbursement payments, including the management fee, <br />otherwise payable to Threehand under this Agreement. Nothing contained herein shall <br />limit the City's rights or remedies against Threehand for any default, including failure to <br />complete the Improvements by the Completion Date. This provision for actual damages <br />shall not be applicable nor act as a limitation upon the City if Threehand abandons the <br />work. In such event, Threehand shall be liable to the City for all losses incurred. <br />3. Reimbursement. Attached is a Preliminary Engineer's Estimate prepared <br />by Aliquot, dated September 14, 2006, (the "Estimate") that sets forth the estimated cost <br />of the Improvements, including, on some line items, the estimated quantities. City shall <br />reimburse Threehand for the Improvements actually constructed, but in an amount no <br />more than $1,887,905.53. Threehand specifically acknowledges that regardless of the <br />actual cost ofthe Improvements, the City's obligation to reimburse Threehand for the <br />Improvements, including design, construction support, the General Contractor's charges, <br />consultant services, change orders, public utility processing and inspection fees, <br />insurance, project management costs asset forth in the Estimate, and business license <br />fees, shall not excced $1,887,905.53. <br />A. Consultants. When Threehand retains Aliquot, Sainte Claire Custom <br />Homes ("General Contractor"), an arborist, a geotechnical engineer and a joint trench <br />Page 2 of 7 <br />