My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
121608
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2008 4:51:53 PM
Creation date
12/10/2008 4:51:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIONS WAYSIDE & DELUCCHI PARKS MASTER PLAN <br />PROPOSAL FOR CONSULTANT SERVICES <br />SUMMARY SCOPE OF WORK <br />A. Initial Orientation and Project Introduction <br />One meeting with Staff (S1) <br />Three Public Meetings (PM1), (PM2), (PM3) <br />and preparation of project context exhibits <br />1. Background Info. & Site Analysis <br />Includes: <br />Photo record of existing park areas and structures. <br />Compilation of existing drawings, reports, memos, etc., relevant to site. <br />Summary of existing & currently proposed uses of facilities. <br />Summary evaluation of existing site elements to remain. <br />Summary of site opportunities and constraints. <br />Note: Evaluations are non-technical, preliminary, of general conditions. <br />2. Program Development <br />"~"1 Includes: <br />Summary compilation of program opportunities. <br />Preprartion of park design program. <br />B. Master Plan Design <br />One meeting with Staff (S2) <br />One Public Meeting (PM4) <br />and preparation of preliminary design plans and exhibits <br />Illustrative Plan & Master Plan <br />Includes: <br />Preparation of site concept sketch plans. <br />Preparation of preliminary building concept sketch plans for bandstand. <br />Preparation of preliminary sketches of park, to clarify concep[s. <br />Preparation of preliminary opinions of construction costs. <br />C. Master Plan <br />One meeting with Staff (S3) <br />One presentation to City Council (PM5) <br />Includes: <br />Staff review, comments, and discussion of preliminary Master Plan. <br />Preparation of Master Plan (text and exhibits). <br />Presentation of Master Plan to Council. <br />Note: Additional services, including preparation of construction documents, <br />and assistance during bidding and construction are not included in this <br />proposal. <br />RICHARD CARSON F[ ASSOCIATES LANDSCAPE ARCHITECTURE AND PLANNING <br />PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.