Laserfiche WebLink
4) Refine conceptual plan to include a 6 (six) foot bike lane akxrg fhe curb <br />and ad%acent to the pedestrian refuge island westbound on Valey Avenue <br />5) Conceptual park landscape plans <br />8) Signet modifkation <br />TASK 6 - 76N. P38E <br />The additional scope of services requested by the City at the meetings of July 23 <br />and October 2, 2008 and the phone meeting of October 8, 2008, will be <br />forwarded through the construction document phase of the project. The 75% <br />P58E's will be modified to carry through the agreed upon design of the east side <br />of Santa Rita Road north of the intersection with Valley Avenue as well as the <br />tasks above. <br />Additional Deliverables: <br />1) Additional typical section for Santa Po?a Road <br />2) Addkional demolitk)n for Santa Rr7a Road <br />3) Additional civil design for Santa Rlta Road <br />4) Additions! constnrction details as required <br />5) Additional landscape and iMgation sheets <br />B) Additional signing and marking design <br />7) Additional traffic signet design <br />8) Additional specifkations as required <br />9) Additional cost estimate items <br />TASK 6 - 7lI0SG PS&E <br />The 100% PSBE's will be modified to carry through the agreed upon 75°.6 PS&E <br />design. <br />Deliverables: <br />f) Additional typical section for Santa Rita Roed <br />2) Additicnal demolition sheets for Santa Rita Road <br />3) Additional civrl design sheets for Sante R~7a Road <br />4) Additional construction details as required <br />5) Additional landscape and irdgation sheets <br />B) Additional signing and marking design <br />7) Additional traffic signal design <br />8) Additional specilrcations as requited <br />9) Additional cost estimate Rams <br />TASK 7 -UTILITY COORDINATION <br />No additional work required. <br />K:1097061007 • Sutra Rita anJ VakyUdmi°1Se,°a RiW Chu~ge OrJcr 10.12-0S.doc Page 4 of 5 <br />