My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
121608
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2008 4:45:54 PM
Creation date
12/10/2008 4:45:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 8 -CONSTRUCTION SUPPORT <br />KHA had originally budgeted 48 hours for construction support during the <br />construction phase of the project to perform the foNowing: <br />1) Address questions during the pre-bid phase and, if necessary, prepare <br />addenda to the construction documents. <br />2) Attend the pre-construction meeting. <br />3) Review contractor RFI's and shop drawings during construction <br />4) Prepare record drawings based upon marked-up information provided by <br />the contractor. <br />Due to the increase scope of work, it is anticipated that an extra f 2 hours may be <br />required during the construction phase. <br />Additional Change Order Request Amount: $58.938 <br />The original contract was for $111,684. The new contract amount would be <br />$188,622. <br />Sincerely, <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />Lynne B. Filson, P.E. <br />#045681 <br /> <br />' //7 ~.~• Authorized Signature <br />/t/' ! ~y <br />Jim West, P.E. <br />#065854 <br />Print Name <br />Dale <br />K;1097aN007 - SaMO Rna and VallgMhninlSmm~ Ride Chengc Order 10-22~08.doe Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.