My WebLink
|
Help
|
About
|
Sign Out
RES 85536
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 3:40:28 PM
Creation date
12/29/1999 7:06:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/5/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
additional 7 intersections on-line by next <br /> Summer, however, because of the projected <br /> completion of some roadway improvements (i.e. <br /> Bernal extension to Sunol), all 7 additional <br /> intersections would not be on-line until mid <br /> August 1986. Staff recognizes the need for <br /> these 17 monitoring intersections and will be <br /> consolidating interconnect programs in order <br /> to get all 17 intersections on-line by next <br /> Summer. Staff is continuing to work with TJKM <br /> in conducting new manual counts and getting <br /> the additional computers installed to convert <br /> the volume to capacity figures generated by <br /> the VMS 220 to levels of service. Staff feels <br /> that the 17 intersection will give the City <br /> monitoring capacities at all the critical <br /> intersections in town. <br /> <br />Committee <br /> Recommendation: 2) CHANGES TO TRAFFIC ASSUMPTIONS BASED ON <br /> REPRESENTATIVE DATA. <br /> <br />Staff Analysis: The standard traffic assumptions adopted by <br /> the City encompass many different aspects. <br /> For several, correlation over time with the <br /> data to be generated by the traffic computer <br /> would be a valuable tool. Data may also be <br /> valuable in analyzing specific proposed <br /> changes. For others, however, the <br /> computer-generated information is of little <br /> or no use. Staff is continuing to work with <br /> TJKM to reach a set of standard assumptions <br /> which realistically project future levels of <br /> servi~e. Changes may occur piecemeal or <br /> comprehensively. At this time, staff is <br /> attempting to refine the assumptions with <br /> whatever data is available; including data <br /> just now coming from the traffic computer. <br /> <br />Committee <br /> Recommendation: 3) REQUIRE LOS AND ADT COUNTS THROUGHOUT THE <br /> YEAR. <br /> <br />Staff Analysis: Staff agrees and will be conducting much more <br /> comprehensive computer and manual counts <br /> throughout the next year. The computer will <br /> generate counts on the major thoroughfares <br /> with manual counts being conducted on the <br /> secondary thoroughfares. This increase in <br /> traffic counts will give the City a more <br /> dynamic account of the City's traffic <br /> situation as will as a valuable check on the <br /> 2-day yearly counts being done by TJKM for use <br /> <br />Page 6 <br />SR85:553 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.