My WebLink
|
Help
|
About
|
Sign Out
RES 85521
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2012 3:27:15 PM
Creation date
12/29/1999 6:54:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/5/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landscaping and irrigation systems will be provided in all median <br /> dividers on Valley Avenue and Stanley Boulevard and roadside areas on <br /> Valley Avenue as directed by City Staff. <br /> <br /> This item includes three person days of onsite observation and <br /> coordination during construction. <br /> <br /> A tree survey will also be conducted to determine the location, size <br /> and species of trees within the project limits. Determination will <br /> be made as to their "Heritage" status. <br /> <br /> Design of street lighting in median dividers will be provided <br /> throughout the project. <br /> <br /> Traffic signalization plans will be prepared for the intersections <br /> of: <br /> <br /> Val 1 ey Avenue/Stanl ey Boulevard <br /> Val 1 ey Avenue/Busch Road <br /> Valley Avenue/Quarry Lane Modifications <br /> <br /> Provisions for at-grade railroad crossing protection will be provided <br /> at two locations: <br /> <br /> 1. Val 1 ey Avenue/Busch Road <br /> 2. Valley Avenue/S.P. Crossing <br /> <br /> The Valley Avenue roadway plan will include a Stage 1/Stage 2 <br /> alternative which will provide for construction of the median island <br /> and two adjacent lanes as the initial project and construction of the <br /> two outer lanes plus curb, gutter and sidewalk as a second stage. <br /> <br /> The area adjacent to the Stanley Boulevard intersection (south side) <br /> will be designed to its full four lane width taking into considera- <br /> tion that the proposed development of the Auf der Maur property may <br /> add an acceleration/deceleration lane at a future date. <br /> <br />3, RIGHT-OF-WAY MAPPING <br /> <br /> An overall right-of-way map will be provided that will indicate and define <br /> all parcels to be acquired. Individual plat maps and legal descriptions <br /> will be prepared for the following categories: <br /> <br /> Val 1 ey Avenue - roadway/sl ope easements <br /> Stanley Boulevard - roadway/sl ope easements <br /> Busch Road crossing <br /> Southern Pacific - maintenance easements <br /> Southern Pacific/Madden - transfer parcels <br /> <br />4. OTHER TASKS <br /> <br /> Field review services are not provided in this contract other than for <br /> interpretation of plans or resolution of conflicts. However, "as-built" <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.