Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF WORK <br /> <br />1. VERIFY EXISTING CONDITIONS <br /> <br /> The existing aerial topography will be reflown in order to reflect the <br /> changed conditions along the south side of Stanley Boulevard. <br /> <br /> Field and administrative research will be conducted with the help of City <br /> Staff, to determine the existence and location of existing overhead and <br /> underground utilities within the project limits. <br /> <br /> It is anticipated that the underground S. P. pipeline is clear of the <br /> proposed improvements and no modifications to it are necessary. <br /> <br />2. PREPARATION OF ROADWAY IMPROVEMENT PLANS <br /> <br /> Bissell & Karn has previously prepared preliminary improvement plans for <br /> this project based on an "at-grade" crossing of the Union Pacific Railroad <br /> near Stanley Boulevard. These plans will be the basis or starting point <br /> of this contract. <br /> <br /> The preliminary plans will he completed and expanded as follows: <br /> <br /> The vertical alignment on Valley Avenue will be adjusted to conform <br /> with the grade crossing structure/roadway plan being prepared by <br /> Del euw-CatheP Co. <br /> <br /> The vertical alignment on Stanley Boulevard will be modified <br /> similarly. The plan and profile drawings fop Stanley Boulevard will <br /> extend to the southeasterly line of the California Street intersec- <br /> tion. The easterly limit will provide full improvements to the City <br /> Limit and minimal conforming from the County line approximately two <br /> hundred feet easterly. <br /> <br /> The basic roadway design will include provision for an underground <br /> storm drainage system to handle the appropriate roadway and <br /> right-of-way area drainage. Horizontal and vertical alignment will <br /> be provided for extension of nearby water and sewer mains. Sizing of <br /> these lines will be as provided by the City. <br /> <br /> Joint trench drawings will be provided for Valley Avenue only, to <br /> include gas, electricity and telephone distribution systems. It is <br /> understood that future developments along the south side of Stanley <br /> Boulevard will provide for the location and design of these <br /> facilities when development occurs. <br /> <br /> An Engineer's Estimate will be prepared and submitted to the City <br /> along with final plans. <br /> <br /> <br />