Laserfiche WebLink
2.3 The Owner shall designate, when necessary, a rap- igned, specified, selected or specially provided for <br /> <br />respect to the Project. The Owner or such authorized ruction Cost does not include the com~ - <br />representative shall examine the documents submitted by <br /> sati n of the Architect and the Architect's con~ult nt~ <br />the Architect and shall render decisions pertaining thereto the oat of the land, rights-of-way, or other cost~ ~ 'hich <br />promptly, to avoid unreasonable delay in the progress of ~;. e respons,b,l,ty of the O~ner as prov,ded <br /> . - . . , · . . <br /> <br />the Architect's services. <br /> ~ The Owner shall furnish a legal description and <br /> <br />grades an ' s of streets, alleys, pave~e and adjoin- d , State- <br />in~ property; rig --of-way, restrict' ~, easements, an- ments ot~robable Construction Co~t ant Detailed <br />croachments, zoning, r - ~ctions, boundaries and Estimates Construction 'Cost, if any, prep by the <br />contours of the site: lo ' ., ~imensions and complete Architect, r present the Architect's best ju merit as a <br /> design profe sional familiar with the constr fion indus- <br />and trees; uH information concernin 'allable serv- try. It is reco nized, however, that neither ~ Architect <br />' "' ' ~ ' ' " ¢ nor the Owne has control over the cost f labor, mate- <br /> <br />2.5 The Owner shall furnish the services of ~oil engi- s rs bi r <br />nears or other consultants when such services are deemed or negotiating onditions. According , the Architect <br />necessan, by the Architect. %oh ~er, ~ces sha',', ~c[ud- ~ cannot and cioes not warrant or repr sent that bids or <br />borings, 'test pits, soft bearing va[ues, pe~ir negotiated prices ,ill not vary from the Projec~ budget <br /> <br />tests, including nec - perations for determining sub- .' s r <br />soil air er conditions, ~ith reports and appropri- other cost estimate o evaluation epared by the Archi- <br /> <br /> No fixed I Construe Cost shall be estab- <br /> The Owner shall furnish structural mechani , <br />chem and other laboratory tests, inspection ~ re- lished as a condition of by the furnishing.. <br />ports as req ' d b~. law or thb Contract D ments. proposal or establishme: budget under Sub- <br /> paragraph 1.1.2 or Paragra or otherwise, unless such <br />2.7 The Owner s urnish all 1 , accounting and in- fixed limit has been agreed on in writing and ¢igned by <br />aurarice counseling serw .. may be necessary at any ' <br />time for the Project, ' 'h auditing services a~ the parties hereto. If such fixed limit has been estab- <br /> <br />the Owner ma uire to verifv the tract~r's Applica- lished, the Architect shall permitted to include con- <br /> <br /> ' ~ " ~ . ' ' ' tarmine what materials nent, component systems <br />bona for ment or to ascertain ho~ or ~hat pur tingencies for design, bidd ~nd price escalation. ~o de- <br /> <br /> and types of constructio~ be included in the Con- <br /> tract Documents, to able adjustments in the <br />2.8 The services, information, surveys and reports re- scope of the Project an in the Contract Docu- <br /> <br />furnished at the Owner's expense, and the Architect shall i li <br />be antifled to rely upon the accuracy and completeness amount of any incr a~ in the Co tract Sum occurring <br /> . . . <br /> <br />2.9 if the Owner observes or otherwise becomes aware i i i not corn- <br /> <br />with the Contract Documents, prompt written notice r ,s <br />thereof shah be gken by the Owner to the Architect. budget or fixec limit of Construction st shah be ad- <br /> <br />peditiously as necessary for the orderly progress of the sion of the Documents to th' Ox~ner and <br />Architect's services and of the Work. the date on proposals are soughta~/a~~x.3Z <br /> 3.2.4 If a/Foject budget or fixed limit of nstruction <br /> <br /> e ~ al r <br /> <br /> CONSTRUCTION COST posal, t Owner shall (1) give written ap~fi <br /> ro~ [ of an <br /> increas . m such fixed limit, (2) authorize rebiddi or re- <br /> DEFINITION ne~oti tin~ of the Project within a reasonable tim , (3} if <br />3.1.1 onstruction Cost shall be the total cost ~ " <br /> the P oject is abandoned, terminate in accordanc with <br />estimated cost Owner of all elements o' roject Para raph 10.2, or (4) cooperate in revisinR the P ject <br /> <br />3.1.2 The Construction include at current 4 I t <br /> <br /> h - <br /> " ' ' '~ the Dra~'ing:~ and Specifications as neces~arv to comp]~ <br /> / <br /> <br /> AIA DOCL%~EN~ B141 · O~%NER XRCH',~i (] ~.(;REE~EN[ * ]H[R1[ ~%~H LDIF[ON · ILLY 1~" · X~& · ~ 1977 <br />6 B141-1977 ~ttE :~%~ER~L~N ~NS1'I]LTE OF -XRCHtT[CTS 1735 NLXX ~ORK &~E>,U[, NAY., %%ASHINCIL)% DC. 2~ <br /> <br /> <br />