1.7.1 Providing analyses of the Owner's needs, and pro- struction, and furnishing services as may be required in
<br />gramming the requirements of the Project. connection with the replacement of such Work.
<br />1.7.2 Providing financial feasibility or other special 1.7.16 Providing services made necessary by the default
<br />_.tudies. of the Contractor, or by major defects or deficiencies in
<br /> the Work of the Contractor, or by failure of performance
<br />1.7.3 Providing planning surveys, site evaluations, envi- of either the Owner or Contractor under the Contract for
<br />ronmental studies or comparative studies of prospective Construction.
<br />sites, and preparing special sur~eys, studies and submis-
<br />sions required for approvals of governmental authorities 1.7.17 Preparing a set of reproducible record drawings
<br />or others having jurisdiction o``'er the Project. showing significant changes in the Work made during
<br /> construction based on marked-up prints, drawings and
<br />1.7.4 Providing services relative to future facilities, sys- other data furnished by the Contractor to the Architect.
<br />terns and equipment which are not intended to be con-
<br />structed during the Construction Phase. 1.7.18 Providing extensi;,e assistance in the uti[ization of
<br /> any equipment or s``'stem such as initial start-up or testing,
<br />1.7.5 Providing services to investigate existing conditions adiusting and balancing, preparation of operation and
<br />or facilities or to make measured drawings thereof, or to maintenance manuals, training personnel for operation
<br />verify the accuraQ/of drawings or other information fur- and maintenance, and consultation during operation.
<br />nished by the Ovvner. 1.7.19 Providing services after issuance to the O``vner of
<br />1.7.6 Preparing documents of alternate, separate or the final Certificate for Payment, or in the absence of a
<br />sectuentia] bids or providing extra services in connection final Certificate for Payment, more than sixty days after
<br />with bidding, negotiation or construction prior to the filing of notice of completion.
<br />completion of the Construction Documents Phase, ',,,,hen 1.7.20 Preparing to serve or serving as an expert witness
<br />requested by the Owner. in connection with any public hearing, arbitration pro-
<br />1.7.7 Providing coordination of VVork performed by ceeding or legal proceeding.
<br />separate contractors or by the Owner's o;vn forces. roviding services of consultants for o
<br />1.7.8 Pro``,iding ser``,ices in connection with the ``york of ' ' -
<br />a construction manager or separate consultants retained o 'd'nge~~~~
<br />
<br />by the Owner. 1.7.22 Providing any other services not otherwise in-
<br />1.7.9 Providing Detailed Estimates of Construction Cost, cluded in this Agreement or not customarily furnished in
<br /> accordance with generally accepted architectural practice.
<br />analyses of owning and operating costs, or detailed quan-
<br />tity surveys or inventories of material, equipment and TIME
<br />labor. 1.8.1 e Architect shall perform Basic and Additio
<br />.10 Providing interior design and other similar s Ser,,'ices as editiously as is consistent with prof onal
<br />,,'ice_ equired for or in connection with the sel ~on, skiIf and care a the ordedy progress of the rk. Upon
<br />procure t or installation of furniture, furni ngs and request of the Ow the Architect sh submit for the
<br />related equip ent. Ov,'ner's approval a sc ule for performance of the
<br />1.7.11 Providing ,,'ices for plan ' g tenant or rental Architect's services v,,hich s e adjusted as required as
<br />spaces. the Project proceeds, and de allowances for peri-
<br /> ods of time require 'view and approval
<br />1.7.12 Making revisions ' awings, Specifications or of submission orities having
<br />other documents w 'ions are inconsistent jurisdictio approved
<br />with written ap reviously given,
<br />are required ' codes, laws ' '
<br />or regu] ' ' uch. doc- '
<br /> ARTICLE 2
<br />
<br />1.7.13 Preparing Drawings, Specifications and sbpporting THE OWNER'S RESPONSIBILITIES
<br />data and providing other services in connection with
<br />Change Orders to the extent that the adjustment in the I The Owner shall pro,,ide full information regard~
<br />Basic Compensation resultin~ from the adjusted Con- req ' ments for the Project including a program,
<br /> shall set ' rth the Owner's design objectives, nstraints
<br />struction Cost is not commensurate with the services re- and criteria, 'cluding space requiremen and relation-
<br />quired of the Architect, provided such Change Orders are
<br />required by causes not solely ~ithin the control of the ships, flexibility a expandability, sp · ial equipment and
<br />,Architect. systems and site requ~ ~ ents.
<br /> 2.2 If the Owner provid budget for the Project it
<br />1.7.14 Making investigations, surveys, valuations, invert- shall include contin 'dding, changes in the
<br />tories or detailed appraisals of existing facilities, and serv- Work during con osts whi'~h are the
<br />ices required in connection with construction performed
<br />b;' the Owner. responsibilit described in
<br />' this Arti 'net shall,
<br />1.7.15 Providing consultation concerning replacement of · f
<br />am \Vork damaged bv ~ire or other cause during con- '
<br />
<br />AIA DOCUN~IENT B141 · ()','~"-[ F,-,\R( !1[:i ( ~ A;iRE~ "dE.x`: ® Tr41RT[I:',,iH [DiT ~)\ · },.L'~ 1'477 · AIA'~ · : ]1)77