My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
102108
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 12:13:40 PM
Creation date
10/16/2008 12:13:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/21/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A <br />Scope of $arvices <br />Bernal Community Pork Phase Z <br />Harris Design <br />Prepared 10/6/08 <br />Page 5 of 8 <br />o Sire construction details <br />o Site detail plans for play area and ocher detailed areas <br />• Architecture <br />o Floor plan <br />o Roof plan <br />o Building sections <br />o Elevations <br />o Typical exterior details <br />• Civil <br />o Utility Layout plans -water and sewer, (with generic symbols for structures) <br />o Staging plans <br />o Roadway plans - on site <br />o Roadway plans -off-site <br />o Parking lot plans <br />o Drainage plans (based on low points provided on grading plans) <br />o Joint Trench layout plans (with references to electrical details) <br />o Preliminary pipe profiles (sec up, with begin and end elevations) <br />o Details provided on 65% design <br />• Electrical <br />o Plans, details, and diagrams for electrical service, distribution, parking lot and <br />access road lighting, sports field lighting, including emergency exiting backup, <br />pathway and area lighting, and site buildings. <br />• Structural and Plumbing <br />o Plans and details for buildings and site structures <br />2.03 Cost Estimate <br />Prepare design-development level estimate of probable construction costs. Compare with project <br />budget. Discuss and define any necessary scope modifications with Staff. <br />2.04 Specifications <br />Prepare technical specification sections. <br />2.05 Staff Review Meeting/Work Session <br />Meet with Staff to review design development submittal, collaborate on design changes and <br />refinements, and receive direction for proceeding with 65% construction document phase. <br />2.06 Additional Staff Meetings <br />Allow for up to two additional meetings/work sessions with Ciry Staff. <br />3.0 Construction Documents <br />3.01 65% Construction Documents <br />• 65% plans, specifications, and cost estimate <br />• One staff meeting [o review 65% submittal <br />
The URL can be used to link to this page
Your browser does not support the video tag.