Laserfiche WebLink
Anachmenr A <br />Scope of Services <br />fJernal Community Park Phase ~ <br />Harris Design <br />Prepared 10/6/08 <br />Page 6 of 8 <br />• Up to two additional Staff working sessions <br />3.02 95% Construction Documents <br />• 95% plans, specifications, and cost estimate <br />• One staff meeting to review 95% submittal <br />• One additional Staff working session <br />3.03 100% Construction Documents <br />• 100% plans, specifications, and cost estimate <br />• One staff meeting ro review 100% submittal <br />• One additional Staff working session <br />• Submit for building permit <br />3.04 Bid Documents <br />• Bid plans and specifications <br />• Final estimate in the form of the bid proposal <br />Project Limits <br />The project limits conform to the Phase 2 area defined in Figure 3 of the Master Plan, with the addition <br />on one soccer field, and the poten[ial addition of access from Bernal Avenue. <br />Assumptions <br />This proposal responds to the scope of the project as is currently known, with an estimated construction <br />value of $8 [o $10 million. Should the scope of improvements increase significantly, additional services <br />may be required. Following is our current understanding of the project construction scope, upon which <br />our proposal is based: <br />• Vehicular Circulation <br />o Parking for 150 cars, asphalt with concrete curbs and bioswales <br />o Access drive from Pleasanton Avenue extension, asphalt with concrete curbs <br />o Possible ingress/egress from Bernal Avenue <br />o Possible temporary parking/drives <br />• Pedestrian Circulation <br />o Concrete and asphalt pathways <br />• Lighting <br />o Parking lo[s <br />o Access roads <br />o Pathways <br />o Buildings <br />o Spectator seating areas <br />• Oak Woodland <br />o Native tree, shrub, and grass planting <br />