My WebLink
|
Help
|
About
|
Sign Out
RES 85351
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2012 4:22:05 PM
Creation date
12/28/1999 12:07:54 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Las Positas Interchange <br /> <br /> 1. Completion of incomplete portion of the interchange at Route 680 <br /> and West Las Positas Boulevard (not including current two-lane <br /> overcrossing portion proposed for construction), including <br /> appurtenant Las Positas Boulevard roadway widening and <br /> improvement east of the interchange. <br /> <br /> 2. Landscaping and irrigation. <br />-' 3. Right of way acquisitions. <br /> 4. Soundwalls. <br /> 5. Interconnected signal systems. ~ <br /> Stoneridge Interchange <br /> <br /> 1. Construction of interchange at Route 680 and Stoneridge Drive <br /> including appurtenant on and off ramps at Stoneridge Mall, and <br /> structure widening to five lanes. <br /> <br /> 2. Landscaping and irrigation. <br /> <br /> 3. Right of way acquisitions. <br /> <br /> 4. Interconnected signal systems. <br /> Route 680 and 580 Widening <br /> <br /> 1. Construction of two additional lanes (one in each direction) <br /> from Stoneridge Drive Interchange at State Route north to <br /> interchange at State Route 580, including structure widening, <br /> landscaping and soundwalls. <br /> <br /> 2. Construction to two additional lanes (one in each direction) <br /> from interchange at State Route 680/580, easterly on Route 580 <br /> to Santa Rita Interchange, including structure widening, <br /> landscaping and soundwalls. <br /> <br /> Hopyard Interchange <br /> <br /> 1. Construction of additional bridge widening at Hopyard <br /> overcrossing of State Route 580 including appurtenant ramp <br /> improvements. <br /> <br /> 2. Landscaping and irrigation. <br /> <br /> 3. Right of way acquisitions. <br /> <br /> 4. Interconnected signal system. <br /> Santa Rita Interchange <br /> <br /> 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.