Laserfiche WebLink
ATTACHMENT A <br />Task 12.3 Rate Negotiations with PGS <br />Upon completion of the review of the data and information received by PGS, R3 will <br />initiate negotiations with PGS. This will include the following subtasks: <br />Task 12.3.1 Meetings with City staff <br />Prepare and submit a brief memorandum to the City summazizing the conclusions <br />of previous analysis and recommend issues to be negotiated with PGS. R3 will <br />attend up to two (2) meetings with City staff to discuss the results of the review <br />and clarify the negotiating points. <br />Task 12.3.2 Negotiations with PGS <br />Facilitate meetings with City staff and representatives of PGS to evaluate the <br />results of the Rate Review, discuss the proposed rates and provide necessary <br />support and documentation to substantiate the rate review findings. <br />Deliverables <br />Task 12 includes the following deliverables: <br />^ Initial letter to the City regarding the completeness of the rate application and data <br />submittal from PGS; <br />• Thorough review of PGS financial data, projected operating costs, projected <br />revenues, capital items, etc.; <br />• Preparation and submittal to the City of an updated rate model in electronic <br />format that incorporates the relevant financial and operational data received <br />during the Review. <br />^ Preparation and submittal to the City of a memorandum summarizing the results <br />of the review of the PGS rate application, including outstanding issues, <br />recommended discussion points, etc. <br />^ Up to two (2) meetings with City staff to review the findings of the review of the <br />PGS rate application; <br />• Up to four (4) negotiation meetings, as necessazy, with PGS and City staff to <br />discuss the Rate Review and reach consensus on the proposed rate structure. <br />Task 13: Technical Assistance with AB 939 Diversion <br />Programs <br />In early 2006, the City engaged R3 Consulting Group to prepare a Base Year Study to <br />establish 2005 as the new reference Base Year. The study results indicated that the City's <br />2005 Diversion Rate was 35% (without credit for inert material recycling) and 49% (with <br />credit for inert material recycling). In addition, only 29% of the total diversion identified <br />in the study resulted from PGS programs. <br />