Laserfiche WebLink
Table 1 <br />Lot Size. Approved Production Home Size, and FAR Calculation for Lots 1-10 <br />Lot <br />No. Lot Size <br />(sq. ft.) Approved <br />House/Garage Size <br />s . ft. FAR <br />(Including garage <br />s . ft. FAR <br />(Excluding 600 sq. <br />ft. of ara e <br />1 21,528 3,791/898 21.7% 17.6% <br />2 19,075 4,333/925 27.56% 22.7% <br />3 18,426 4,121/962 27.58% 22.4% <br />4 19,271 4,333/925 27.28% 22.5% <br />5 22,657 4,333/925 23.21 % 19.1 <br />6 17,095 4,652/970 32.72% 27.2% <br />7 16,839 4, 457/1,020 <br />(2 U =782) 36.57% 30.5% <br />8 16,152 4,652/970 34.81% 28.8% <br />9 16,051 4,357/1,020 <br />(2 U =782) 38.37% 32% <br />10 15,811 4,357/1,020 <br />(2 U =782) 38.95% 32.5% <br />Staff is recommending that the City Council support the previously approved home <br />sizes as part of PUD-05, as shown above, reflecting the Chrismans' acknowledgement <br />that the sizes are acceptable to them. <br />The Continued Use of the Well by the Chrismans After Citv Water Service is Provided to <br />their Property <br />When the tentative vesting map was appealed to the City Council, the City Council <br />imposed a condition concerning the Chrismans' continued use of the well on the <br />Brozosky property after City water service is provided to the Chrisman property: <br />Condition No. 23 of the Tentative Vesting Map 7399 states: <br />"When the developer of the Chrisman property extends the water line providing <br />City water to the Chrisman residence, the developer shall extend the water line <br />from the Chrisman driveway to the Brozosky property line within the EVA area <br />shown on the tentative map. The size of the water line shall be the same as the <br />size of the water line that serves the Chrisman residence. The developer of the <br />Chrisman property shall also pay for and install at the edge of but within the <br />Brozosky property at 5/8-inch water meter, which meter shall serve the Brozosky <br />property only. Payment includes the standard connection fees for such meter. <br />Prior to the installation of the water line to the Brozosky property, and prior to the <br />installation of the meter, the Brozoskys may increase the size of the water line <br />and/or the meter at their own expense. The Brozoskys may connect to the <br />Page 6 of 12 <br />