Laserfiche WebLink
Z-580 Freeway Edge July 29,. 1986 <br /> Page 2 of 4 <br /> <br /> Data Col lection, continued <br /> <br /> 3. Other utility easements/R.O.W. constraints <br /> <br /> 4. Existing and proposed land use - make a coCosite map <br /> with vi si bi 1 i ty regui rements. <br /> <br /> 5. Existing and proposed zoning. <br /> <br /> 6. Existing City of Pleasanton signage ordinances or <br /> guidelines (if applicable). <br /> <br /> 7. Proposed City instigated projects. <br /> <br /> B. Aerial photos 1" = 100' (dates available?). <br /> <br /> g. Landscape guidelines from Flood Control/CalTrans/PG&E <br /> (setbacks, plant material, irrigation and maintenance <br /> requirements, etc. ). <br /> <br /> 10. Future BART extension/plans/impacts. <br /> <br />B. POD to Prepare a visual character analysis of the project <br /> area including: <br /> <br /> 1. Hajor views <br /> 2. Landmark s <br /> 3. Signage elements <br /> 4. Land use character <br /> 5. Visual quality <br /> 6. Issues and opportunities (with City participation} <br /> <br />C. The City is to identify goals and objectives for the <br /> project. <br /> <br /> PHASE II - CONCEPT DEVELOPMENT <br /> <br />A. POD is to develop overall design concepts and alternatives <br /> with City participation. <br /> <br /> 1. Prepare a series of studies which would illustrate <br /> possible concepts and strategies in context with City <br /> goals and objectives, and past or future City instigated <br /> projects. <br /> <br /> 2. Identify the role of the various components of the <br /> freeway corridor. <br /> <br /> a. CalTrans R.O.W. <br /> b. Private property (developed and undeveloped) <br /> <br /> <br />