Laserfiche WebLink
1-580 Freeway Edge July 29,. 1986 <br /> Page 3 of 4 <br /> <br /> Concept Development, continued <br /> <br /> c. Flood control channel <br /> d. Interchanges <br /> e. Gateways <br /> f. Building setbacks and massing on private lots <br /> g. Soundwalls <br /> <br /> 3. Prepare illustrative plans and sections of typical <br /> freeway edge design recommendations. <br /> <br /> 4. Prepare illustrative studies of major entrances/gateways <br /> and prototypical interchanges. <br /> <br /> 5. The City to review implementation priorities and phasing <br /> opportunities. <br /> <br /> 6. POD is to provide typical installation costs. <br /> <br /> 7. The City will provide maintenance costs and review the <br /> implications of construction and maintenance costs for <br /> the project. <br /> <br />PHASE III - 1-580 CORRIDOR LANDSCAPE MASTER PLAN <br /> <br />A. Prepare a draft and final report to include above summary of <br /> the conclusions of Phase I and II, as well as the !qaster <br /> Plan and implementation guidelines. The report will include <br /> draft versions of the following. <br /> <br /> 1. Overall summary of !qaster Plan and implementation <br /> guidelines. <br /> <br /> 2. Specific design plan for entire designated length of <br /> 1-580 corridor with prototypical sections. <br /> <br /> 3. Detailed studies of prototypical conditons (approx. 8 <br /> conditions). <br /> <br /> 4. Prepare landscape and tree. planting palette for all <br /> conditions, based on city's preliminary palette. <br /> <br /> 5. Prepare budget evaluation to include installation and <br /> life cycle maintenance costs. <br /> <br /> 6. Recommend phasing and implementation priorities. <br /> <br /> <br />