Laserfiche WebLink
 July 29, 1986 <br /> <br />............................· Chandler Lee <br />s.,~,p,~,,.,: Principal Planner <br />"~'""""~' City of Pleasanton ......... <br />,~.~m,... 200 Old Bernal Avenue <br />r,,.km..., P.O. Box 520 <br /> Pleasanton, CA g4566 <br />Principals: <br /> <br /> ~m...., RE: SCOPE OF WORK FOR 1-580 FREEWAY CORRIDOR STUDY <br /> Willam F. Schub <br /> Dear Chandler: <br /> <br /> ...,on.: The following is, our revised study approach and scope of work <br /> tm..m~.~..vs.~ for the 1-580 Corridor Study from the Dublin Grade to E1 Charro <br /> c..~.~mz,m Road. We have included the revisions/additions we discussed. <br /> ~vm6~m.4~ indicated responsibility for each task and sbmnmarized the <br /> schedule we discussed. <br /> <br />,~i_,o,.: The Study is composed of three phases and is as follows. <br /> Lafayette Proturk ~ <br />~,,m..- PHASE I - ANALYSI 5 <br />Cmmllemtm moor/ <br />~q3Y3134~l~ <br /> Prepare a thorough inventory. analysis and evaluation of <br /> existing conditions. <br />Regmonal Office: <br />z~6~...... A. The City is to collect data and base infomation including: .......... <br /> <br />h.F...~. 1 Delineation of Study Area. <br /> <br /> 41S/311-3eZ3 <br /> 2, Freeway P1 ans, <br /> <br />,.~o~c,fic.: a. 'As-built' drawings for freeway corridor <br />~4sR~.... o limit of R.O.W. <br /> ° shoulder dimensions <br />~.~ o fence 1 ine <br />z, vN.ss, · signage locations <br /> o topo and- grading , <br /> b. Existing and proposed improvements <br /> <br /> EXH)BIT A <br /> <br /> <br />