Laserfiche WebLink
That the CC&R5 of the proposed development provide for <br />the establishment of a Homeowners Association to <br />maintain, among other things, all commonly held open <br />space, the cabana club and rear yard drainage swales <br />and silt basins, and that if a pumping system is <br />required to boost water pressure in the area to the <br />required level, maintenance and operation of that <br />system shall be the responsibility of the Homeowners <br />Association and not the City. That the CC&RS shall <br />be reviewed and approved by the City Attorney. <br />That the developer shall pay any and all fees that the <br />property is subject to. <br />That all in tract easements be granted as public <br />service easements with no reference to specific use. <br />That the number, size and location of fire hydrants <br />in the development be subject to the approval of the <br />Fire Department. <br />10. That the developer provide all street lighting <br />facilities necessary to adequately light the streets <br />within and adjacent to this tract at the lowest <br />possible cost to the City. <br />11. That all electric power distribution and communication <br />service systems shall be placed totally underground. <br />12. That approval of the water supply and distribution <br />system be withheld until the developer has demonstrated <br />to the satisfaction of the City Engineer that the <br />proposed system meets all of the requirements for <br />such a sanitary sewer system. <br />13. That approval'of the sanitary sewer system for the <br />project be withheld until the developer has demonstrated <br />to the satisfaction of the City Engineer that the <br />proposed system meets all of the requirements for such <br />a sanitary sewer system. <br />14. That approval of the storm drain system be withheld <br />until final design calculations have been made and <br />the developerhas demonstrated to the satisfaction of <br />the City Engineer that the system fully meets the <br />requirements f this development and all upstream <br />areas intende~ to be drained through this tract and <br />that the requirements of Alameda County Flood Control <br />District have ',been met. <br />15. That approval'of the precise design of streets and <br />street improvements be withheld pending final design -~ <br />review by the City Engineer. <br />-2- <br />