Laserfiche WebLink
CH2M HILL will work under the direction of the <br /> City's engineering staff or its designated <br /> representative. <br /> <br /> · The work must conform to the current standards of <br /> Caltrans and the City. Reference documents include <br /> Caltrans material such as: <br /> <br /> - Project Development Procedures Manual <br /> - Highway Design Manual <br /> - Traffic Manual <br /> - Right-of-Way Manual <br /> - Bridge Design Practice Manual <br /> - Survey Manual <br /> - Drafting Manual <br /> - Standard Specifications 1984 <br /> - Standard Plans 1984 <br /> - Standard Special Provisions <br /> - Traffic Sign Specifications <br /> <br /> . CH2M HILL will make available to the City or <br /> Caltrans information developed by this work task <br /> for their use in preparing project agreements and <br /> other procedural and financial activities. <br /> <br /> SCOPE OF SERVICES <br /> <br />CH2M HILL's work, covered by this AMENDMENT, is described in the <br />following tasks. <br /> <br />TASK 1-1: ADMINISTRATION AND MANAGEMENT <br /> <br />CH2M HILL will be the prime contractor with the City for all <br />services for this work. Subconsultants may be utilized for <br />services such as site surveying or soils drilling for the <br />geotechnical investigation. Subconsultants will contract <br />directly with CH2M Hill. CH2M HILL will be responsible for <br />management of the project consultant team, coordination with the <br />City and affected agencies, and production of reports, maps, and <br />right-of-way documents. Subtasks are: <br /> <br /> Task 1-1.1: Administration <br /> <br /> Administer the prime contract with the City and the <br /> contracts with subconsultants. Monitor compliance with <br /> the provisions of the agreements. Provide a single <br /> point of contact for the City with regard to contractual <br /> matters. <br /> <br /> - 2 - <br /> <br /> <br />