My WebLink
|
Help
|
About
|
Sign Out
RES 87190
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2012 4:53:50 PM
Creation date
12/13/1999 11:06:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/5/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2-1 - OUT OF SCOPE WORK <br /> <br />Task 2-1.1 - Schedule Extension <br /> <br />The original project schedule of 12 months was extended to <br />19 months requiring the CONSULTANT to schedule and attend <br />project meetings and to monitor project activities for <br />7 months longer than anticipated. <br /> <br />Task 2-1.2 - Project Study Report Traffic Analysis <br /> <br />In response to Caltrans' request, the CONSULTANT produced, <br />developed and delivered forecasts of traffic conditions for <br />a new 1-580/I-680 interchange configuration to be included <br />by Caltrans in their Project Study Report. <br /> <br />Task 2-1.3 - Additional Traffic Calibration <br /> <br />Caltrans review and approval of the CONSULTANT's traffic <br />modeling methodology required significantly more time and <br />effort than originally anticipated. Field work by <br />CONSULTANT was necessary to obtain current traffic data to <br />replace obsolete Caltrans data. <br /> <br />Task 2-1.4 - Additional Traffic Alternatives <br /> <br />In response to requests by the Project Development Team, <br />nine additional traffic scenarios were investigated in <br />detail. The work included alternatives for interchange <br />phasing and configuration, land use projections, <br />intermediate years, and the freeway/interchange system. <br /> <br />Task 2-1.5 - ABAG Demographic Data <br /> <br />New land use data (ABAG 85) required modification by the <br />CONSULTANT to extrapolate the data to the design year (2010) <br />and to conform the ABAG zonal structure with the traffic <br />model (37 census tracts to 118 traffic analysis zones). <br /> <br />Task 2-1.6 - Intermediate Year Land Use <br /> <br />In response to a request from the FHWA, the CONSULTANT <br />calculated land use data for an intermediate analysis year <br />(year 2000). <br /> <br />Task 2-1.7 - Caltrans' Environmental Assessment <br />Modifications <br /> <br />In response to requests by Caltrans, the CONSULTANT prepared <br />two major revisions to the original administrative draft <br />environmental document and consulted with Caltrans in the <br />review of the revised documents. The work required format <br />revisions, additional analysis, text modifications, meetings <br />and reproduction. <br /> <br /> -2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.