My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 3:46:58 PM
Creation date
3/14/2008 3:46:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
building measures. Said verification shall be provided prior to occupancy of the <br />home. <br />64. The applicant shall implement the following measures with the construction of the <br />estate home on the 19-acre lot so that aroof-mounted photovoltaic system can <br />be installed in the future: <br />a. Install electrical conduit and pull string from the roof/attic areas to <br />the building's main electrical panels; <br />b. Engineer the roof trusses to handle an additional load as <br />determined by a structural engineer to accommodate the additional <br />weight of a prototypical photovoltaic system beyond that anticipated <br />for roofing; and <br />c. Provide an area near the electrical panel for the "inverter" required <br />to convert the direct current output from the photovoltaic panels to <br />alternating current; <br />These measures shall be indicated on the building permit plan sets. <br />Building Conditions <br />65. The applicants shall obtain a building permit, and any other applicable City <br />permits for the project prior to the commencement of any construction. <br />66. The new dwelling shall be constructed to meet or exceed Title 24 State energy <br />conservation requirements. <br />67. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building Department will issue permits. <br />68. To initiate the building permit plan check process, the applicant shall submit the <br />following: <br />a. Three (3) full-size sets of construction plans (wet-stamped and signed); <br />b. Two (2) sets of the necessary structural and Title 24 calculations; <br />c. Two (2) copies of asite-specific soils report; <br />d. One (1) copy of the Green Building checklist with points calculated. <br />e. The completed Building Permit Questionnaire; and <br />f. The necessary fees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.