Laserfiche WebLink
^~^ Kimley-Horn <br />~ and Associates, Inc. <br />July 12, 2007 <br />Mr. George Farrell, page 4 <br />- Extending the westbound right turn lane from westbound Valley Avenue to <br />northbound Santa Rita Road. Alternatives that may eliminate the need to relocate <br />the PG&E vault will be explored. <br />- The sidewalk relocation and berm modifications on the south side of Valley <br />Avenue east of Santa Rita Road. With assistance from Callander Associates, the <br />KHA team's Landscape Architect, KHA will evaluate possible sidewalk <br />alignments with consideration given to tree removals, grading quantities, <br />irrigation modifications, aesthetics, and cost. Two options will be presented to <br />the City. <br />- Street drainage in the vicinity of the median relocation on Valley Avenue east of <br />Santa .Rita Road. With the center of the intersection at a higher elevation than the <br />east leg of the intersection and Valley Avenue sloping longitudinally towards the <br />intersection, relocating the median may cause water to drain from the centerline <br />of the roadway towards the median with no where to go. KHA will evaluate <br />options, including the installation of a new catch basin along the median, and <br />present the one or two best options to the City. <br />Task 5 - 75% PS&E <br />The KHA design team will prepare the detailed design of the project, produce special <br />provisions, and construction estimate in accordance with the City's policies, procedures, <br />manuals, and standards as required to for the construction contract documents. The plan set will <br />generally be at a scale of 1 "=20' and is estimated to include: <br />- Title Sheet <br />- General Notes and Abbreviations <br />- Typical Sections <br />- Civil Design Sheets (2 sheets) <br />- Construction Details <br />- Storm Drain Lateral Profile <br />- Landscape and Irrigation (3 sheets) <br />- Signing and Marking <br />- Traffic Signal Plan (2 sheets) <br />Estimated total number ofsheets -13 <br />Task 6 -100% PS&E <br />Once the review comments from the 75% have been received and resolved, they will be <br />incorporated into the 100% PS&E's. Unsigned plans will be submitted to the City for a final <br />review and then signed PS&E will be submitted. <br />S:\Marketing\_Proposal & SOQ\Pleasanton\Santa Rita and Valley\Updated Letter Proposaldoc <br />