My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachement E <br />PBS&J Proposal <br />• any additional documentation, such as preparation of an EIR/EIS stated in this scope will be <br />approved as a separate task order. <br />Schedule <br />PBS&J will complete the Administrative Draft IS/MND within sixteen (16) weeks of receiving an <br />executed contract and. an approved initial project description. PBS8~J assumes a four (4) week <br />review period by Carollo Engineers and City staff. PBS&J wilt incorporate one set of final <br />comments on the administrative draft, prepare a mitigation monitoring and reporting plan, and <br />submit final documents for approval and public circulation in two (2) weeks from receiving <br />comments on the Administrative Draft. <br />In summary, PBS&J will complete the final IS/MND within twenty-two (22) weeks of receiving <br />notice to proceed or an executed contract. The final documents will be circulated for public <br />review for thirty (30) days approximately 4 weeks. <br />to total, the schedule calls for the final documents, MMRP, Public Review period, Public <br />Response to Comment Memorandum, and Project Approvat to be completed in approximately <br />twenty-six (26) weeks from receipt of the executed contract? Neither PBS&J nor City of <br />Pleasanton anticipate any. delays in this schedule; however, some amount of uncertainty exists <br />until the project description and pump station design drawings-are selected and approved. <br />s PBS&J can begin work upon receipt of a Notice to Proceed. An executed contract must be <br />received within 30 days of the Notice to Proceed. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.