My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
021908
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2008 4:50:03 PM
Creation date
2/13/2008 4:43:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachement E <br />PBS&J Proposal <br />PBS&J recognizes the importance of thorough project management responsibilities along with <br />clear and concise communication. With that understanding PBS&J will attend up to three (3) <br />meetings not including project specific public hearings. <br />Task 7 Work Product: <br />PBSSJ .will submit detailed monthly invoices and monthly status reports. <br />Cost <br />Total cost for completion of the tasks listed above is based on Time and Materials, including <br />direct expenses. The attached budget sheet provides a breakdown of tasks, personnel assigned <br />to each task, hours allotted, billing rates, and direct expenses. The projected cost is based on <br />the following key assumptions: <br />^ PBS&J will strictly adhere to the scope of work presented above; <br />• analysis will rely on technical reports prepared by City of Pleasanton- staff, Carollo <br />Engineers, other consultants and agencies -PBS&J will prepare only those technical reports <br />that are listed above in the Biological and Cultural Resource items. Other technical <br />documents such as hazardous materials investigations, air quality sampling, and surface or <br />groundwater modeling, as these will not be needed for preparation of the environmental <br />documentation; <br />PBSBJ will print up to 40 copies of the final environmental documents and 20 copies of the <br />MMRP; <br />- basic engineering designs and specifications (such as a site plan layout, equipment list and <br />underground infrastructure improvements) will be available during the study; <br />- no significant delays in the environmental review process are anticipated by PBS&J unless <br />necessitated by alterations of the proposed project ;and <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.