Laserfiche WebLink
,~, . <br />Attachement E ~ - <br />PBS&J Proposal ' <br />Noise <br />PBS&J will characterize existing noise conditions at the project site to evaluate the effects of the <br />pump station on the nearest sensitive noise receptors. We understand. noise impacts should be <br />temporary and limited to the construction activities. Although, not anticipated, pump station <br />equipment could increase the ambient noise levels in the project area, this will evaluated during <br />the environmental review from information provided by Carollo Engineers in accordance with the <br />manufacturer's equipment specifications. Appropriate mitigation measures will be developed for <br />any construction or operational impacts found to be potentially significant. This will be verified <br />through the environmental review process. <br />Population and Housing Information <br />PBS&J will examine the potential to induce substantial growth by providing infrastructure <br />beyond the projected growth levels in the county; CEQA commonly refers to this as growth <br />inducing effects. For example, if the infrastructure is built, then unexpected growth follows soon <br />after these newly developed systems could be deemed inadequate. PBS8~J will address <br />potential significant affects by formulating the appropriate mitigation measures or preparing <br />defensible arguments for the City of Pleasanton's improvements to their water distribution <br />system. <br />Transportation and Circulation <br />PBS&J assumes that construction of the proposed project would require daily trips of <br />construction vehicles traveling to and from the project site and along the pipeline alignments. <br />Most heavy equipment and construction vehicles entering or exiting the project sites would be <br />temporary and -short-term. Construction staging would occur at areas set back from the <br />roadways and within the proposed project area. There is, however, the possibility that <br />construction traffic and hauling could adversely affect the traffic flows or circulation at the project <br />site. PBS&J will evaluate these potentially significant impacts and design mitigation measure to <br />reduce the impacts to less than significant. <br />Utilities and Service Systems <br />PBS8~J will properly assess if there could be significant impacts to utility or service providers as <br />this relates to the water supply systems. PBS&J will specifically analyze any issues related to <br />Department of Public Health (DPH) regulatory guidance as it relates to installation and operation - <br />of water supply systems. In order to expedite any of the DPH permitting process, we can <br />6 <br />