Laserfiche WebLink
Mr. Huy A. Ho, P.E. <br />The City of Pleasanton <br />January 30, 2008 <br />Page 3 <br />• Surface utility field survey. <br />• Prepare legal description and plat for the anticipated property/easement <br />acquisition for submittal to CalTrans. <br />• Aerial photograph of site at scale of 1" = 200'. <br />• Digital topographic map at scale of 1" = 20' with contour interval of one <br />foot within the pump station site. <br />• Color digital orthophotography of pump station site at scale of 1" = 20'. <br />Deliverables: <br />• Summary of ground control coordinates (one hard copy). <br />• Electronic file referencing the record property boundary and existing _ <br />easements (AutoCAD file). _ <br />• Surveyed utility summary sheet with coordinates and description (Excel <br />file). <br />• Dip sheets (one hard copy for each manhole or catch basin). <br />• Legal description and plat for newly acquired property/easement (one <br />copy). <br />• 9" x 9" color contact prints of aerial photography (two copies). <br />• Digital planimetric/topographic map and digital terrain data (AutoCAD <br />file). <br />• TIFF image with corresponding TFW file (one file on CD-ROM). <br />4.2 Geotechnical: DCM will provide services as asub-consultant to assist in this <br />task. The scope of work includes: <br />• Research and site reconnaissance. <br />• Permits, boring locations, and utility notifications. Assumes City will waive <br />any encroachment permit fees and will provide for rights-of-access. <br />• Subsurface investigation including 4 test borings (3 to a depth of 20 feet, <br />1 to a depth of 55 feet) and laboratory testing. Assumes that <br />contaminated soil will not be encountered. <br />• Prepare draft and final geotechnical report. <br />• Review of 90 percent plans and specifications. <br />Deliverables: <br />• Draft Geotechnical Investigation Report (2-hard copies). <br />• Final Geotechnical Investigation Report (5 hard copies). <br />4.3 Potholing: EXARO Technologies will provide services as asub-consultant to <br />assist in this task. <br />H:\Final~Pleasanton_WCO\Contract\FievisedTasklLetterHO.doc Page 3 of 6 <br />