Laserfiche WebLink
DRAFT 3. Circulation Element <br /> <br /> <br /> <br /> <br /> .., , <br /> <br /> <br /> <br /> <br />Proposed Regional Roadway Improvements <br />To address freeway congestion, the Citv of Pleasanton has been working with other local agencies, the <br />Alameda County Congestion Management Agency, the Metropolitan Transportation Commission, and <br />Caltrans. The Cities of Pleasanton, Dublin, and Livermore along with Alameda County recently <br />completed the "Tri Valley Triangle Study," which investigated several new regional improvements for <br />future construction. The Triangle Study focused on benefits to the "I'ri-Valley area and determuied <br />which protects would provide the greatest benefit for the least cost. The study also identified funding <br />and construction priorities to ensure proiect funding in an organized and efficient manner, .These <br />rojects include: <br />I-580: <br />^ I-580 Westbound High Occupancy Vehicle/Toll Lane from Greenville. Road to Foothill Road <br />^ I-580 Eastbound High Occupancy Vehicle/Toll Lane from Foothill Road to Hacienda Drive <br />Hacienda Drive to Greenville Road assumed complete in Triangle Study) <br />^ I-580 Eastbound Truck Climbing Lanes <br />^ I-580 Auxiliary Lanes <br />^ I-580 Fifth Mixed Flow Lane from Santa Rita Road to Vasco Road <br />^ Preservation of BART Right of Way in I-580 Median <br />^ I-580 Westbound to I-680 Southbound Direct Connect Flyover <br />Circulation Element 012908 redline 3-23 City Counci) Ol 29 08 <br />