o Testing and Startup Activities <br /> <br /> The project team, supplementea when necessary by <br /> · other CH2M BILL technical staff, will provide <br /> assistance in organizing, coordinating, and over- <br /> seeing the testing activities. Work items related <br /> to this effort include the following: <br /> <br /> - Monitor the cleaning and flushing of all <br /> valves, tanks, pumps, and pipelines. <br /> <br /> - Monitor the prestressing operation. <br /> <br /> - ~Monitor pressure and water tests. <br /> <br /> Monitor mechanical and electrical tests. <br /> <br /> - .Field-check the control panels. <br /> <br /> o Contract Close-Out <br /> <br /> When the Contractor has substantially completed <br /> his work, he will request final acceptance in <br /> writing. A final inspection, arranged by the <br /> project manager, will be artended by the Con- <br /> tractor and appropriate City staff. The resident <br /> inspector will then prepare the final deficiency <br /> list and deliver it to the Contractor. <br /> <br /> The Contractor will correct the items on the final <br /> deficiency list and will submit a release of liens <br /> certifying that all of the Contractorts bills and <br /> obligations are paid and that he releases the City <br /> from all claims. A letter will also be required <br /> from the Contractorts surety company stating no <br /> objection to the final settlement with the <br /> Contractor. <br /> <br /> When all of the above has been accomplished, the <br /> construction inspector will recommend final <br /> acceptance and payment. <br /> <br />Subtask 4C: Construction Surveying and Staking <br /> <br />This task involves installation of horizontal and vertical <br />control staking for the new reservoir site, transmission <br />pipeline route, drainage pipeline route, access roadway, and <br />bridge structure. The scope of work is based on the assump- <br />tion that control staking will be installed initially for <br />the Contractor~s use and that subsequent field staking to <br />replace damaged stakes will be the responsibility of the <br />Contractor or can be provided by CH2M HILL for an additional <br />fee paid by the Contractor. This technique reduces the sur- <br />veying fees paid by the City and avoids contractor abuse of <br />the City supplied service. <br /> <br /> A-6 <br /> <br /> <br />