Construction staking will include= <br /> <br /> o Alignment and grade stakes for the new reservoir <br /> <br /> o Alignment stakes for the transmission pipeline <br /> <br /> o Alignment and grade stakes for relocation of util- <br /> ities included in the construction contract <br /> <br /> o Alignment and grade stakes for rough grade <br /> <br /> o Alignment and grade stakes for new drain system <br /> <br /> o Alignment and grade stakes for the access road <br /> <br /> o Construction staking cut sheets for Contractor and <br /> City inspectors <br /> <br />TASK 5 ADDITIONAL WORK REQUIRED BY CITY <br /> <br />Any work outside the scope of services required by the City <br />will be performed by CH2M HILL and reimbursed at the rates <br />shown in Exhibit C. <br /> <br /> ESTIMATED FEE <br /> <br />CH2M HILL proposes to provide these services on a time and <br />expense basis with an estimated maximum fee of $428,600. We <br />will invoice the City monthly for actual labor and expenses <br />charged to the project. The estimated fee per task is out- <br />lined below. <br /> <br />TASK 2 - Additional Field Investigation, <br /> Coordination, and Permitting <br /> <br /> 2A Geotechnical Investigation $ 22,300 <br /> 2B Right-of-Way and Easement 5,000 <br /> 2C Plat Preparation and Surveys 10,000 <br /> 2D Site Procurement 2,500 <br /> 2E Permitting 5,000 <br /> 2F Coordination 14,000 <br />TASK 3 - Final Design 159,000 <br />TASK 4 - Services During Construction <br /> 4A Bidding Assistance 15,000 <br /> 4B Services During Contruction ]86,800 <br /> 4C Construction Surveying and Staking 9t000 <br /> TOTAL $428,600 <br /> <br />Average 1987 hourly billing rates are summarized in Exhibit C. <br /> <br /> A-7 <br /> <br /> <br />