My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
18 ATTACHMENT 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2008 3:39:23 PM
Creation date
1/10/2008 3:34:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT 15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. This development plan shall be of no further validity and the project developer <br />shall be required to submit the same or new development plan for City approval <br />prior to development of the site in the event that the project developer fails to <br />record a final map within two years of PUD approval. <br />5. Prior to the demolition of any existing structure(s) located on the Hatsushi <br />property, the applicant shall have the structures examined for the presence of lead, <br />lead-based paint, and/or asbestos by a qualified environmental professional. If <br />lead and/or asbestos are found to be present, demolition of these structures shall be <br />conducted in accordance with the applicable requirements of the California <br />Department of Industrial Relations (Cal-OSHA) for lead, and Cal OSHA and the <br />Bay Area Air Quality Management Board (BAAQMD for asbestos. The applicant <br />shall provide to the Planning Director afollow-up report within 30-days after <br />demolition of the structure(s) is completed. <br />6. The project developer shall pay any and all fees, including fees associated with the <br />Vineyard Avenue Corridor Specific Plan, to which the properties covered by this <br />PUD Development Approval are subject in accordance with the provisions of the <br />Vineyard Avenue Corridor Specific Plan Financing Program or prior to issuance <br />of building permits. The type and amount of the fees shall be those in effect at the <br />time the building permit is issued. <br />7. The homes covered by this approval shall be constructed to encourage <br />telecommuting by providing as an option telecommunications infrastructure <br />consistent with state-of--the-art methods at the time that the homes are submitted <br />for site-specific design review approval. <br />S. The project developer shall show on the Tentative Subdivision Map a separation <br />line generally following the 510-foot contour line of Parcel "A", which <br />corresponds to a 30-foot rear building setback from the Hatsushi home and <br />accessory structures, subject to the review and approval by the Planning <br />Commission. All building setbacks for Parcel "A" shall be measured from this <br />separation line. <br />9. Vehicular access to Lots 10 through 13 for construction and non-construction <br />traffic may be temporarily provided by way of the Emergency Vehicle Access <br />(EVA) connection to Montevino Drive until such time as the public street/cul-de- <br />sac connection to Clara Lane or Vineyard Avenue is achieved. Afterward, the <br />EVA shall be used for emergency vehicles only. <br />10. A quick completion of the Clara Lane extension to Road "A" of the development <br />covered by this approval is urged. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.