My WebLink
|
Help
|
About
|
Sign Out
RES 87049
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 12:55:10 PM
Creation date
12/10/1999 11:22:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/3/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James R. Walker <br /> January 26, 1987 <br /> Page 2 <br /> <br />fiscal information and the most useful formats for reporting <br />that information. The fiscal model will than be modified to <br />produce the data in the form most useful to the City, and <br />updated forecasts will be run and summarized in this format. <br />We will also investigate the availability of information that <br />would support the quantification of service levels in the <br />City and incorporate that in the update report to the extent <br />possible. The updated information will be presented in a <br />final report to the City. <br /> <br />The work described above will complete the update for <br /> <br />1986-87. Early in 1988, GG+A will begin work preparatory to <br />the next annual update. At this time, it is difficult to <br />foresee how the City's information needs might change in <br />response to specific issues, how the structure of City fi- <br /> <br />nances may have changed or the degree to which development <br />projections and other important assumptions and parameters <br />may need to be reviewed and revised. Therefore, we propose <br />that each year, subsequent to 1987, we begin the update with <br />a reconnaissance that would identify relevant fiscal issues <br />and areas wher'~ updating and/or additional research data <br />would be required. The output of the reconnaissance would be <br />a report summarizing the fiscal trends and issues that the <br />update should address, the specific areas where data updating <br />and/or research will be required, and the amount of time and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.