Laserfiche WebLink
BSK Proposal No. GP07-2093 <br />Novemher 19, 2007 <br />Page 3 <br />staffing aril testing levels vxl related fee estimates. Fur budget estimating purposes, we have <br />assumed that soils technician will be required at least 30 Percent of the total a>nshllction period of <br />365 working days or approximately 6 hours per day for 120 days. We estimate total charges for the <br />scope of work outlined herein with be ,~~46,2d0. However, the actual total billing will depend un the <br />project construction schedule, encountered site conditions; weather conditions and overall work <br />progress. VVe Gvill not exceed this estimate without prior approval and authorization from the City of <br />Pleasanton. A breakdown of our assumed man-power and staffing requirements, number of tests and <br />related fees is presentee] below: <br />PART A: EARTH`VORK TESTING AND OBSERVATION <br />Item <br />FIELD ~ voRK <br />Field TeelullCla^ ISeil Sampling, Testing and Cibservationsl: <br />Nuclear Density Gauge: <br />Field EIlglneer (Penodic Site Visitsl: <br />PrO~eCt M£lnager (~taetings and Consultatiunl: <br />Lit BOR~1 TOR 3' <br />Compaction Test (AST1vI DI557j: <br />6-inch Muld (Base Rock): <br />4-inch ~Iolc] (Soil): <br />Sieve Analysis: <br />Atterberg Limits (Plasticity Index j: <br />R-value Tests: <br />\sphalt Concrete Nlax. Density (ASThI D2726j <br />OFFICE - RF_ l~'IEiYS ~1 ND RF.PORTI!VG <br />Registered Eneineer: <br />Word Prt.tccssor: <br />antihf Unit Rate <br />520 Hours $ 80 <br />500 Hours 5 <br />60 Hours 96 <br />2d hours 125 <br />3 Test, <br />6 "Celts <br />d Tests <br />3 1~ests <br />Tests <br />Test <br />$ 190 <br />150 <br />120 <br />150 <br />200 <br />50 <br />Fees <br />$41,600 <br />2,500 <br />5,760 <br />3,000 <br />`~ 570 <br />900 <br />=ISO <br />=150 <br />60i ) <br />700 <br />ti0 Hours `~ 1 25 $7.500 <br />-t0 Hours ~-!5 1,500 <br />TOT.aL F,S'TI~~IA"1'L P.~R"I' A = $66,86f1 <br />P.\R"I' B: tiPECI.~l.1'1' INSPI/C"PION .yNU "fESTING <br />item Quantity L!nit Rate Fees <br />FIELD It~ORK <br />Field "fe.clulician iilhset~~:,t+~~n5 ~ samp~c Picknp,: 120 Hours `~ ~0 $9.600 <br />Equipment i~~nii{ne. ~~~~~~r load, uT~: Zd Days ~0 960 <br />Project Nlana;er,''Coordinator: 25 Hours 96 2,100 <br />Lf1 BOR~1 TOR }' TES TIN G <br />Concrete Compression Tests: 12 Sots `~ 70 $840 <br />B51< <br />