My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
121807
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2007 3:59:07 PM
Creation date
12/12/2007 3:37:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BSK Proposal No. CJl'07-2093 <br />November 19, ?007 <br />Page. -1 <br />Block Compression Tests: <br />Grout Compression Tests: <br />C'ach SS 6~t0 <br />1 ? Sets 75 900 <br />Ul`~'f~7C'E - REYIEIi S.-a;VD RI'PORThVG <br />Responsible Engineer Keview: <br />Final Affidavit: <br />Word Processor: <br />?0 I (ow-s $ 125 ~t2,500 <br />1 Report 600 600 <br />?0 Hours 45 900 <br />TOTAI, ESTIMATF. PART B = $19,380 <br />GRAND TOTAL ESTiNIATE, PARTS A + R = $ 86,2~t0 <br />;Vote: Tests not listed above would be charged per our current Fee Scl:edcrle. <br />3. S'taf'f if vailability and Unique OualiTeations <br />BSK has the qualified and Highly experienced staff and local laboratory facilities to provide testing, <br />inspection and geotechnical engineering support services needed to successfully complete this <br />project. Further, as the Geotechnica] Engineer-of=Record, ~~~e bring a unique and intimate knowledge <br />and understanding regarding site conditions that will impact the execution of this project. <br />Having successfully completed gcotechnical studies and construction testing and observation <br />functions during the ilevclopment of Augustine Bernal Park, Creekside Commwlity Park, Pleasanton <br />Sports Park Corporation yard and recently completed Val Vista Community Park, Alviso Adobe <br />Community Park (on-going), and Emerald Glen Park in Dublin, we have a proven record on projects <br />similar in nature and scope as the planned Bernal Community Park project. <br />Our lord branch is in cli~se proximity to the project site ~uul we have the flexibility. staffing and <br />inclination to respond promptly to you requirements. <br />BSK has current. recent, similar-and successful experiences ~~~ith other local cities ~u~d aLencies and <br />~~e enjo~~ a positive reputation within our industry and conununity. ~~ <br />Our ci~mplete, clear and timely reports along with n~ri~dcrate and fair billing practices will reduce <br />administrative burdens fir the City. <br />~1. Insurance> Certificates Suhniittal <br />BSK currently has on file with the City of Pleasanton all insurance cei~titicates required on public <br />work projects. We will submit project-specific insurance certificates required under the consultant <br />contract for the subject project covering general, auto and professional liabilities and workers' <br />compensation insurances within two weeks of rer.eiving authorization to proceed with our services. <br />ssic <br />
The URL can be used to link to this page
Your browser does not support the video tag.