My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2007 2:27:52 PM
Creation date
11/28/2007 12:52:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
control and other cultural requirements. Quantitative data for the first year will be collected in the <br />summer of 2009. <br />Balance will carry out the hydrologic monitoring plan described in the mitigation and monitoring <br />plan created under Task 4. Although we have not yet formulated the five-year monitoring plan, <br />we anticipate installing continuous-recording dataloggers in the mitigation wetland and in the <br />Mission Creek diversion structure in order to measure the flows into the wetland and resulting <br />water level fluctuations in the wetland, as well as bypass flows on Mission Creek. Eight site <br />visits per year will be conducted to collect collect data and maintain the dataloggers. Monitoring <br />will be conducted and reported on a water year basis (October 1 through September 30), with the <br />hydrologic monitoring reported in the annual report. <br />Following City review and approval, the first annual report will be submitted to agencies by <br />December 31, 2009. If additional site visits or coordination with the City or landscape contractor are <br />required due to circumstances beyond our control, we will request budget augmentation. <br />Task 12. Project Administration and Team Meetings <br />We have budgeted additional time for coordination among project team members, the City of <br />Pleasanton staff, and agency staff, and administrative activities, such as contracting, invoicing, and <br />work scope development. <br />TOTAL TASKS 1-12 $183,323 <br />OPTIONAL SERVICES, MITIGATION MONITORING YRS 2-5 <br />Task 13. Year 2 Mitigation Monitoring and Reporting (2010) OPTIONAL <br />The services noted above for year 1 will be repeated, although the frequency of hydrologic <br />monitoring at Mission Creek will be reduced. <br />Task 14. Year 3 Mitigation Monitoring and Reporting (2011) OPTIONAL <br />The services noted above for year 1 will be repeated, but the frequency of hydrologic monitoring at <br />the Mission Creek site will be reduced. <br />Task 15. Year 4 Mitigation Monitoring and Reporting (2012) OPTIONAL <br />The services noted above for year 1 will be repeated, but the frequency of hydrologic monitoring at <br />the Mission Creek site will be reduced. <br />Task 16. Year 5 Mitigation Monitoring and Reporting (2013) OPTIONAL <br />The services noted above for year 1 will be repeated, but the frequency of hydrologic monitoring at <br />the Mission Creek site will be reduced. A wetland delineation of the Mission Creek site will be <br />conducted and site visits with agency staff will be conducted. The agency site visits will most likely <br />occur in 2014, after the final annual report has been submitted. <br />TOTAL TASKS 13-16 (YRS 2-5) <br />$81,430 <br />City of Pleasanton/proposal7rev2 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.