Laserfiche WebLink
Year 1 of post-construction mitigation monitoring and reporting for both the Bernal <br />Bridge and Mission Creek mitigation sites <br />Years 2-5 of post-construction mitigation monitoring and reporting and a wetland <br />delineation at Mission Creek wetland in year five presented as a contract option (please <br />note that 5 years of monitoring will be required by the permits issued by the agencies); <br />Project administration and meetings. <br />Schedule <br />The wetland delineation, hydraulic modeling, final mitigation plans for Bernal Bridge and the <br />Mission Creek site will be completed within eight weeks of authorization to proceed. A <br />burrowing owl survey will be conducted (included in this proposal) for the Mission Creek site <br />prior to the removal of soils for the ballfield site. Plans and specifications (biddable documents) <br />will be completed within four weeks of preliminary agency approval of the final mitigation <br />plans. We cannot guarantee the timing of the resource agency permits, but expect that they will <br />not be issued until early to mid-April. <br />Assumptions <br />• Two phases of as-built topographic plans of the Mission Creek site will be produced by <br />the City's Contractor, and electronic files will be delivered to Mosaic. The first as-built <br />topographic map will show existing conditions of the site prior to the removal of soils for <br />the ball fields. The City will coordinate directly with the Contractor to ensure that the <br />Mission Creek site is not over-excavated to generate till for the ballfields (e.g. excavated <br />to elevations below those shown on Fig. 2 of the Balance conceptual plan for Mission <br />Creek wetlands, May 30, 200'7). The second as-built plan will show topography of the <br />Mission Creek site following the ballfield excavation. <br />• The excavation of soil from the Mission Creek site to generate fill for the ballfields will <br />not result in impacts to waters ofthe U.S. or state in Mission or Fairgrounds Creek. <br />• We will receive pump system configuration and drawings for the Valley Avenue <br />underpass from the City, as well as ground-water monitoring data from the developer at <br />the Bernal Property, and/or the Zone 7 Water Agency. <br />• The area ofconstruction-related disturbance near Bernal Bridge project requiring <br />irrigation of restoration plantings will be 0.4 acre. <br />• The area of riparian plantings that will be irrigated around the Mission Creek wetland site <br />will be approximately 1.15 acres. <br />• A single bid package for both mitigation sites will be produced. <br />Exclusions <br />• Design elements such as paved areas, utility coordination, SWPPP, demolition plans <br />other than details for the outfall/diversion structure in Mission Creek and piping from the <br />underpass to Fairgrounds Creek, signage, electrical improvements other than irrigation- <br />related, bidding or construction-related assistance beyond those items specifically <br />described herein, schematic irrigation design; <br />• Installation and maintenance of the mitigation sites; <br />• Extensive revisions of plan documents beyond the scope and fee structure described <br />herein; <br />• Mitigation planning or permitting services beyond those described herein. <br />City of Pleasanton/proposal7rev2 2 <br />