Laserfiche WebLink
"EXHIBIT A" <br />MOSAIC ASSOC[ATES ~ ~.~ <br />2;i~~~ S~~~. P~xi~~;lri ~t r. St~~rh~ z~r,. ['wcii.~~.C'A ydS~~ Pi~~;iS~o~~~6~-ta~.~;~ f=.~s~~;io>q~!-n3yfi riarurti~~~'ti~ur,iux~i.~:~:_~. <br />November 15, 2007 <br />Huy Ho <br />Associate Civil Engineer <br />City of Pleasanton <br />P.O. Box 520 <br />Pleasanton, CA 94566-0802 <br />Proposal: Permitting, Wetland and Riparian Mitigation Plans, Preconstruction Surveys, <br />Construction and Post-construction Monitoring, Bernal Bridge at Arroyo del Valle, <br />Pleasanton <br />Dear Huy: <br />Thank you for the opportunity to present this proposal for continued biological and regulatory <br />compliance services for the Bernal Bridge project. This proposal covers services through the first <br />year of mitigation monitoring and reporting, with a continuation of monitoring and reporting for <br />years 2-5 as an option, as you requested. This proposal covers the services detailed below. <br />Services <br />• Coordination with the Army Corps of Engineers (USAGE), Regional Water Quality <br />Control Board (RWQCB), California Department of Fish and Game (CDFG) and U.S. <br />Fish and Wildlife Service (USFWS) on the permit applications and the mitigation sites, <br />including assistance with assigning credit for the excess wetland/riparian area at the <br />Mission Creek site to a future City of Pleasanton project; <br />• Conceptual wetland mitigation design for Mission Creek mitigation site (complete); <br />• Wetland delineation at the Mission Creek mitigation site; <br />• Wetland and riparian mitigation plans for the Mission Creek site, with hydrologic <br />analysis and development of the grading plans for wetland mitigation by Balance <br />Hydrologics and LTD Engineering; <br />• Riparian mitigation plan for Arroyo del Valle to restore the areas disturbed during bridge <br />construction; <br />• Biddable plans and specifications for the Arroyo del Valle wetland and riparian <br />restoration plan and the Mission Creek wetland and riparian mitigation plan; <br />• Preconstruction surveys at the Bernal Bridge and Mission Creek sites; <br />• Construction monitoring at the Bernal Bridge site; <br />City of Pleasantoniproposal7rev2 <br />