Laserfiche WebLink
4. Wall Insulation inspection. To be made after frame inspection is approved and all <br />wall insulation is in place. <br />5. Lath and/or wallboard inspection. To be made after lathing and wallboard, interior <br />and exterior, is in place but before plaster is applied or before wallboard joints and <br />fasteners are taped and finished. <br />6. Attic and above ceiling insulation inspection. To be made after lath and or wallboard <br />inspection and all attic and above ceiling insulation has been installed. <br />7. Final inspection. To be made after finish grading and the building is completed and <br />ready for occupancy. <br />305A.6 Required Building and/or Property Service Equipment Inspections. <br />305A.6.1 General. For all stand alone plumbing, mechanical and electrical permits and <br />all other building and/or property service equipment for which a permit is required by <br />this code shall be inspected by the Building and Safety Official. Building service <br />equipment intended to be concealed by a permanent portion of the building shall not be <br />concealed until inspected and approved. Before any property service equipment is <br />buried or covered it shall be inspected by the Building and Safety Official. When the <br />installation of building and/or property service equipment is complete, a final inspection <br />shall be made. Building and/or property service equipment regulated by the technical <br />codes shall not be connected to the water, fuel or power supply or sewer system until <br />authorized by the Building and Safety Official. <br />305A.6.2 Operation of building service equipment. The requirements of this section <br />shall not be considered to prohibit the operation of building service equipment installed <br />to replace existing building service equipment serving an occupied portion of the <br />building in the event a request for inspection of such building service equipment has <br />been filed with the Building and Safety Official not more than 48 hours after the <br />replacement work is completed, and before any portion of such building service <br />equipment is concealed by permanent portions of the building. <br />305A.7 Other Inspections. In addition to the called inspections specified above, the <br />Building and Safety Official may make or require other inspections of construction work <br />to ascertain compliance with the provisions of this code the technical codes and other <br />laws which are enforced by the City of Pleasanton. <br />305A.8 Re-inspections. A re-inspection fee may be assessed for each inspection or re- <br />inspection when such portion of work for which inspection is called is not complete or <br />when inspections called for are not made. <br />This section is not to be interpreted as requiring re-inspection fees the first time a job is <br />rejected for failure to comply with the requirements of the technical codes, but as <br />controlling the practice of calling for inspections before the job is ready for such <br />inspection or re-inspection. <br />Re-inspection fees may be assessed when the inspection record card is not posted or <br />otherwise available on the work site, the approved plans are not readily available to the <br />30 <br />