Laserfiche WebLink
3 <br /> <br /> Prior to the initial concrete placement, the proposed mix designs will be reviewed. During the <br /> placement operations, the concrete placement inspection will include: <br /> <br /> · Slump control <br /> <br /> · Monitor of batch time <br /> <br /> · Monitor of water/cement ratio <br /> · Vibratory placement and use <br /> <br /> · Cast cylinders for compression testing <br /> <br /> Masonry (Signet Testing Labs) When requested, we will provide continuous inspection of laying <br /> and placement of masonry units, reinforcing mortar and grout. Our inspection services will <br /> include~ but are not limited to: <br /> <br /> · Monitor block moisture <br /> · Monitor mixing~ time on board <br /> <br /> · Mortar sampling <br /> <br /> · Block placement <br /> <br /> · Grout placement, sampling <br /> <br /> · Rebar placement, clearances <br /> <br /> · Fin removal <br /> <br /> · Clean outs installation <br /> <br />Laboratory Testincj of Asphalt Concrete (Signet Testing Labs) As requested by the City of <br />Pleasanton, sornples will be obtained from the field far laboratory analysis. The laboratory test <br />programs will be conducted in accordance with the State of California Standard Specifications <br />Section 35). The testing program will include extraction, gradation and stabilometer value <br />determinations. <br /> <br />Final Report (Merrill, Seeley, Mullen, Sandefur, Inc.) <br />At the completion of the construction observations, a report will be issued summarizing the <br />observations, testing programs and opinions. <br /> <br /> <br />