My WebLink
|
Help
|
About
|
Sign Out
RES 87529
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 1:41:44 PM
Creation date
12/8/1999 12:48:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction cost. Develop a bid proposal for inclusion in <br />the bidding documents for use by contractors in preparing' <br />and submitting construction bids. <br /> <br />Task 4-4: Final Design Surveys <br /> <br />Perform field surveys to collect data for final design. <br />Update existing topography in areas of recent construction. <br />Prepare and file a Caltrans monumentation map. Installation <br />and establishment of permanent monumentation for any purpose <br />is not included as part of this work scope. <br /> <br />TASK 4-5: FINALIZE PS&E <br /> <br />The purpose of this task is to respond to the review com- <br />ments of the 90 percent complete PS&E by the City, Caltrans <br />District 4, Caltrans Headquarters, FHWA and other required <br />parties. A meeting with the City, Caltrans and the CONSUL- <br />TANT will be held to establish a list of mutually agreed <br />upon changes. The CONSULTANT shall then make such changes <br />to the satisfaction of Caltrans. Subsequent revisions re- <br />quired by additional reviews after incorporation of these <br />modifications shall be considered extra work. Provide one <br />set of final original specifications and estimate, and one <br />set of full size final composite mylar plan sheets to the <br />City. <br /> <br />TASK 5: BIDDING ASSISTANCE <br /> <br />The purpose of this task is to assist the City during the <br />bidding phase of the project. The work will include the <br />following tasks: <br /> <br /> 20 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.