Laserfiche WebLink
construction cost. Develop a bid proposal for inclusion in <br />the bidding documents for use by contractors in preparing' <br />and submitting construction bids. <br /> <br />Task 4-4: Final Design Surveys <br /> <br />Perform field surveys to collect data for final design. <br />Update existing topography in areas of recent construction. <br />Prepare and file a Caltrans monumentation map. Installation <br />and establishment of permanent monumentation for any purpose <br />is not included as part of this work scope. <br /> <br />TASK 4-5: FINALIZE PS&E <br /> <br />The purpose of this task is to respond to the review com- <br />ments of the 90 percent complete PS&E by the City, Caltrans <br />District 4, Caltrans Headquarters, FHWA and other required <br />parties. A meeting with the City, Caltrans and the CONSUL- <br />TANT will be held to establish a list of mutually agreed <br />upon changes. The CONSULTANT shall then make such changes <br />to the satisfaction of Caltrans. Subsequent revisions re- <br />quired by additional reviews after incorporation of these <br />modifications shall be considered extra work. Provide one <br />set of final original specifications and estimate, and one <br />set of full size final composite mylar plan sheets to the <br />City. <br /> <br />TASK 5: BIDDING ASSISTANCE <br /> <br />The purpose of this task is to assist the City during the <br />bidding phase of the project. The work will include the <br />following tasks: <br /> <br /> 20 <br /> <br /> <br />