Laserfiche WebLink
Construction Traffic Control <br /> <br /> Construction Detours <br /> <br /> Special Details, Traffic Controls for Lane <br /> <br /> Closures <br /> <br /> Temporary Pavement, Delineators, and Median <br /> <br /> Railing Through Construction Area <br /> <br />The above list of plans is based upon current Caltrans format <br />and requirements at the time of execution of this AMENDMENT. <br />Changes to these requirements by Caltrans may be cause for <br />extra work and/or may require changes in the scope of work <br />and corresponding fee modifications. Provide two sets each <br />of full-size blueline prints to the Cities and Caltrans for <br />concurrent review, comment, and approval for the following <br />stages of project completion: 30 percent, 60 percent, and <br /> <br />90 percent. <br /> <br />Task 4-2: Special Provisions <br /> <br />Relevant Special Provisions based on the latest version of <br />Caltrans Standard Special Provisions to the Standard Speci- <br />fications will be assembled. The Standard Special Provisions <br />and draft new Special Provisions will be modified as needed <br />to define the work. A set of Dummy Special Provisions will <br />be prepared for submittal to the Cities and Caltrans for <br />formal concurrent review and approval. <br /> <br />Task 4-3: Estimates and Bid Proposal <br /> <br />Perform detailed quantity takeoffs including item descrip- <br />tions and units in conformance with Caltrans BEES format and <br />requirements. Develop unit cost information from Caltrans <br />Contract Cost Data and local sources. Prepare engineer's <br />estimate showing items, quantities, costs, and total project <br /> <br /> 19 <br /> <br /> <br />