My WebLink
|
Help
|
About
|
Sign Out
RES 87499
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87499
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:42:33 AM
Creation date
12/7/1999 12:49:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/17/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL ENGINEERING · ENGINEERING GEOLOGY · ENVIRONMENTAL GEOLOGY <br /> <br /> FEE SCHEDULE <br /> <br /> The following schedule presents typical rates for professional and technical <br /> services. If desired, services can be contracted on a negotiated fixed-fee <br /> basis, or fixed-rate basis. <br /> <br /> Personnel Hourly Rate <br /> <br /> Non-Technical Assistant ........................... $ 31.00 - 35.00 <br /> Word Processor .................................... 40.00 - 44.00 <br /> Technical Assistant/Drafter ....................... 45.00 - 50.00 <br /> Laboratory Technician ............................. 55.00 - 58.00 <br /> Field Technician* ................................. 55.00 - 58.00 <br /> Field Engineer/Geologist* ......................... 60.00 - 64.00 <br /> Engineer/Geologist ................................ 65.00 - 69.00 <br /> Project Engineer/Geologist ........................ 70.00 - 74.00 <br /> Senior Engineer/Geologist ......................... 75.00 - 79.00 <br /> Project Manager ................................... 80.00 - 84.00 <br /> Associate Engineer/Geologist ...................... 85.00 - 89.00 <br /> Associate ......................................... gO.O0 - 94.00 <br /> Principal Engineer/Geologist ...................... 95.00 -100.00 <br /> Principal/Consultant .............................. 105.00 -125.00 <br /> Geophysicist and Geophysical Equipment ........... (Quoted on Request) <br /> <br /> *Field Technician or Field Engineer with Nuclear Density <br /> Gauge add $3.00 per hour to hourly rate. Overtime for <br /> time in excess of 8 hours and Saturday work is 1.5 <br /> times hourly rate. Sunday work is two times and <br /> Holiday work is three times hourly rate. Minimum field <br /> time is 2 hours. <br /> <br /> Minimum Fee for professional services is $600.00. <br /> <br /> Oeposition, Hearing and Court Appearance <br /> <br /> $500.00 per half day (minimum) <br /> Preparation at applicable hourly rates. <br /> <br /> Mileage <br /> <br /> $.30 per mile. <br /> Hours and mileage are charged portal to portal. <br /> <br /> Subcontract services, consultants' fees, equipment rental (such as drilling, <br /> bulldozing and trenching needed for geotechnical investigations), aerial <br /> photographs, incidental expenses, and extra report copies are charged at <br /> cost plus 20%. <br /> <br /> Invoices will be submitted at the completion of work or at two-week <br /> intervals. Invoices are payable upon presentation. Invoices 30 da(~, past <br /> due will be subject to a service charge of one and one-half percent -1/2%) <br /> per month from date of invoice. <br /> <br /> 3/87 (Side 1) <br /> <br />5167 Johnson Drive · Pleasanton ° California · 94566 · (415)463°C)844 <br />MAIN OFFICE: 1900 Ernbarcader0 Road , Suite200 · PaloAIto , California · 94303 · (415)856,6750 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.