Laserfiche WebLink
LABORATORY TESTS <br /> <br />Sample Preparation .............................................................. $ S5.00/hour <br />Sieve Analysis, pit run with 200 wash ........................................... 63.00/test <br />Wash Analysis (pit run) ......................................................... 47.00 <br />Short Hydrometer Analysis (assumed Sp. Gr.) ..................................... 60.00 <br />Long Hydrometer Analysis (assumed Sp. Gr.) without 200 wash ..................... 100.00 <br />Long Hydrometer Analysis (assumed Sp. Gr.) with 200 wash ........................ 140.00 <br />Specific Gravity {Sand and Gravel) .............................................. 60.00 <br />Specific Gravity (Clay) ......................................................... 75.00 <br />Moisture Determination and Unit Weight .......................................... 11.00 <br />Moisture Only ................................................................... 8.00 <br />Shelby Tubes .................................................................... 13.00 <br />Atterberg Limits: a. Liquid Limit ............................................. 55.00 <br /> b. Plastic Limit ............................................ 55.00 <br /> c. Plasticity Index ......................................... 110.00 <br /> d. Shrinkage Limit ............................ ~ ............. BO.O0 <br />Shrinkage Factors ............................................................... 85.00 <br />Sand Equivalent ............................... · .................................. 65.00 <br />Unconfined Compression .......................................................... 50.00 <br />Triaxial compression tests on hourly basis, <br /> estimates quoted on request, according to type. <br />Swell Test, per point ........................................................... 52.00 <br />Multiple Point Plot ............................................................. 11.00 <br />Swell Test, 3-Point with Plot ................................................... 115.00 <br />Direct Shear (quick), per point ................................................. 44.00 <br />Direct Shear (consolidated), per point .......................................... 63.00 <br />Consolidation Test - 6 load and 2 unload increments per test .................... 300.00 <br /> Each additional loading or unloading increment ................................ 25.00 <br />Consolidation, e/p curve plot ................................................... 26.00 <br />C.B.R. and Expansion, cohesionless soil ......................................... 390.00 <br />C.B.R. and Expansion, cohesive .................................................. 500.00 <br />Cement Treated Base, Mold, Cure and Compression Test, Per Point ................. 52.00 <br />R-Value, California State Highway (no additives) ................................ 150.00 <br />R-Value, California State Highway, cement, lime or other additives .............. 170.00 <br />Compaction Curves: a. Standard ................................................ 110.00 <br /> b. Modified, 4" Mold ....................................... 120.00 <br /> c. Modified, 6" Mold ....................................... 160.00 <br /> d. California Impact ....................................... 120.00 <br /> e. Check Points ............................................ 75.00 <br />Durability per fraction ......................................................... 110.00 <br />Per~..eability Tests ............................. ~ ................................ Hourly Rates <br />Expansion Index Test {Uniform Building Code Standard No. 29-2) .................. 125.00 <br />Corrosion Tests, Williams-Corfield Nipple and Can Method (3 specimens) .......... 140.00 <br />Unconsolidated-Undrained Triaxial Test..~ ....................................... 80.O0/test <br />Tests not shown ................................................................. (Quoted on Request} <br /> <br /> {Side 2) <br /> <br /> <br />